Laserfiche WebLink
I <br /> F. Contractor's Expense: Contractor shall Engineer to pay or to see to the payment of any <br /> I provide all data in support of any proposed moneys due any such Subcontractor, Supplier, or <br /> substitute or"or-equal" at Contractor's expense. other individual or entity except as may otherwise be <br /> required by Laws and Regulations. <br /> 6.06 Concerning Subcontractors, Suppliers, and <br /> 1 Others D. Contractor shall be solely responsible for <br /> scheduling and coordinating the Work of Subcon- <br /> A. Contractor shall not employ any Subcon- tractors, Suppliers, and other individuals or entities <br /> I tractor, Supplier, or other individual or entity (includ- performing or furnishing any of the Work under a <br /> ing those acceptable to Owner as indicated in direct or indirect contract with Contractor. <br /> Paragraph 6.06.6), whether initially or as a <br /> replacement, against whom Owner may have E. Contractor shall require all Subcontrac- <br /> t reasonable objection. Contractor shall not be <br /> required to employ any Subcontractor, Supplier, or tors, Suppliers, and such other individuals or entities <br /> performing or furnishing any of the Work to commu- <br /> other individual or entity to furnish or perform any of nicate with Engineer through Contractor. <br /> the Work against whom Contractor has reasonable <br /> I objection. F. The divisions and sections of the <br /> Specifications and the identifications of any <br /> B. If the Supplementary Conditions require Drawings shall not control Contractor in dividing the <br /> I the identity of certain Subcontractors, Suppliers, or Work among Subcontractors or Suppliers or <br /> other individuals or entities to be submitted to Owner delineating the Work to be performed by any specific <br /> in advance for acceptance by Owner by a specified trade. <br /> date prior to the Effective Date of the Agreement, <br /> I and if Contractor has submitted a list thereof in G. All Work performed for Contractor by a <br /> accordance with the Supplementary Conditions, Subcontractor or Supplier will be pursuant to an <br /> Owner's acceptance (either in writing or by failing to appropriate agreement between Contractor and the <br /> t make written objection thereto by the date indicated Subcontractor or Supplier which specifically binds <br /> for acceptance or objection in the Bidding the Subcontractor or Supplier to the applicable terms <br /> Documents or the Contract Documents) of any such and conditions of the Contract Documents for the <br /> Subcontractor, Supplier, or other individual or entity benefit of Owner and Engineer. Whenever any such <br /> I so identified may be revoked on the basis of reason- agreement is with a Subcontractor or Supplier who <br /> able objection after due investigation. Contractor is listed as an additional insured on the property <br /> shall submit an acceptable replacement for the insurance provided in Paragraph 5.06, the <br /> I rejected Subcontractor, Supplier, or other individual agreement between the Contractor and the <br /> or entity, and the Contract Price will be adjusted by Subcontractor or Supplier will contain provisions <br /> the difference in the cost occasioned by such whereby the Subcontractor or Supplier waives all <br /> replacement, and an appropriate Change Order will rights against Owner, Contractor, and Engineer„ <br /> Ibe issued . No acceptance by Owner of any such and all other individuals or entities identified in the <br /> Subcontractor, Supplier, or other individual or entity, Supplementary Conditions to be listed as insureds <br /> whether initially or as a replacement, shall constitute or additional insureds (and the officers, directors, <br /> I a waiver of any right of Owner or Engineer to reject <br /> defective Work. partners, employees, agents, consultants and <br /> subcontractors of each and any of them) for all <br /> losses and damages caused by, arising out of, <br /> C. Contractor shall be fully responsible to relating to, or resulting from any of the perils or <br /> Owner and Engineer for all acts and omissions of causes of loss covered by such policies and any <br /> the Subcontractors, Suppliers, and other individuals other property insurance applicable to the Work. If <br /> or entities performing or furnishing any of the Work the insurers on any such policies require separate <br /> O just as Contractor is responsible for Contractor's <br /> own acts and omissions. Nothing in the Contract waiver forms to be signed by any Subcontractor or <br /> Supplier, Contractor will obtain the same. <br /> Documents: <br /> I 6.07 Patent Fees and Royalties <br /> 1. shall create for the benefit of any such <br /> Subcontractor, Supplier, or other individual or entity A. Contractor shall pay all license fees and <br /> any contractual relationship between Owner or royalties and assume all costs incident to the use in <br /> I Engineer and any such Subcontractor, Supplier or the performance of the Work or the incorporation in <br /> other individual or entity, nor the Work of any invention, design, process, product, <br /> or device which is the subject of patent rights or <br /> 1 2. shall anything in the Contract Documents <br /> create any obligation on the part of Owner or copyrights held by others. If a particular invention, <br /> design, process, product, or device is specified in <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright®2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> I00700-21 <br /> 04/08 Final Version 054893 <br />