My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 2. if Owner and Contractor are unable to 3. the extent of such authority and responsi- <br /> I agree on entitlement to or on the amount or extent, if bilities will be provided. <br /> any, of any adjustment in the Contract Price or <br /> Contract Times that should be allowed as a result of B. Unless otherwise provided in the <br /> such other work, a Claim may be made therefor as Supplementary Conditions, Owner shall have sole <br /> 1 provided in Paragraph 10.05. authority and responsibility for such coordination. <br /> B. Contractor shall afford each other 7.03 Legal Relationships <br /> I contractor who is a party to such a direct contract, <br /> each utility owner and Owner, if Owner is performing A. Paragraphs 7.01.A and 7.02 are not <br /> other work with Owner's employees, proper and safe applicable for utilities not under the control of Owner. <br /> access to the Site, a reasonable opportunity for the <br /> I introduction and storage of materials and equipment <br /> and the execution B. Each other direct contract of Owner under <br /> tion of such other work, and shall Paragraph 7.01.A shall provide that the other <br /> properly coordinate the Work with theirs. Contractor contractor is liable to Owner and Contractor for the <br /> I shall do all cutting, fitting, and patching of the Work reasonable direct delay and disruption costs <br /> that may be required to properly connect or incurred by Contractor as a result of the other <br /> otherwise make its several parts come together and contractors actions or inactions. <br /> properly integrate with such other work. Contractor <br /> I shall not endanger any work of others by cutting, C. Contractor shall be liable to Owner and <br /> any oth <br /> excavating, or otherwise altering their work and will other contractor for the reasonable direct delay <br /> only cut or alter their work with the written consent of and disruption costs incurred by such other <br /> Engineer and the others whose work will be affect- contractor as a result of Contractor's action or <br /> I ed. The duties and responsibilities of Contractor inactions. <br /> under this Paragraph are for the benefit of such <br /> utility owners and other contractors to the extent that <br /> I there are comparable provisions for the benefit of ARTICLE 8 - OWNER'S RESPONSIBILITIES <br /> Contractor in said direct contracts between Owner <br /> and such utility owners and other contractors. <br /> I 8.01 Communications to Contractor <br /> C. If the proper execution or results of any <br /> part of Contractor's Work depends upon work per- A. Except as otherwise provided in these <br /> formed by others under this Article 7, Contractor General Conditions, Owner shall issue all communi- <br /> 1 shall inspect such other work and promptly report to cations to Contractor through Engineer. <br /> Engineer in writing any delays, defects, or deficien- <br /> cies in such other work that render it unavailable or 8.02 Replacement of Engineer <br /> I unsuitable for the proper execution and results of <br /> Contractor's Work. Contractor's failure to so report A. In case of termination of the employment <br /> will constitute an acceptance of such other work as of Engineer, Owner shall appoint an engineer to <br /> fit and proper for integration with Contractor's Work whom Contractor makes no reasonable objection, <br /> I except for latent defects and deficiencies in such whose status under the Contract Documents shall <br /> other work. be that of the former Engineer. <br /> 1 7.02 Coordination 8.03 Furnish Data <br /> A. If Owner intends to contract with others A. Owner shall promptly furnish the data <br /> for the performance of other work on the Project at required of Owner under the Contract Documents. <br /> I the Site, the following will be set forth in <br /> Supplementary Conditions: 8.04 Pay When Due <br /> I 1. the individual or entity who will have <br /> authority A Owner shall make payments to <br /> and responsibility for coordination of the Contractor when they are due as provided in <br /> activities among the various contractors will be Paragraphs 14.02.0 and 14.07.C. <br /> identified; <br /> I 8.05 Lands and Easements; Reports and Tests <br /> 2. the specific matters to be covered by such <br /> authority and responsibility will be itemized; and A. Owner's duties in respect of providing <br /> 1 lands and easements and providing engineering <br /> surveys to establish reference points are set forth in <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright®2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> I00700-27 <br /> 04/08 Final Version 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.