Laserfiche WebLink
COMMENTS <br /> The comments section is where you can enter any notes during the debris removal <br /> process while overseeing the debris removal contractor.This is a good place to <br /> summarize daily tasks as you go along observing the debris removal process. <br /> Example: Followed Ceres down trail A where a 4-man crew was deployed to remove <br /> eligible debris along the trail and chipped. Moved to Trail b with crew where eligible <br /> debris was removed and chipped along the trail. Equipment utilized was chainsaws,a <br /> chipper,a skid steer,and small tractor with cart in tow. <br /> Lead Monitor/ Supervisor end of day finalizing <br /> Lead monitor/Supervisor shall perform QA/QC of data captured by monitors on the <br /> daily report and sign and date to the right of the top of the sheet after review. <br /> Any needed corrections may be done in red pen by the lead monitor only and initialed <br /> by the lead monitor. <br /> The lead monitor shall scan reports and any other relevant back up documentation of <br /> debris removal efforts and put them in an electronic folder for the day. <br /> Any hard copy back up shall then be clipped by date together and placed in a weekly <br /> envelope which shall be dated for that weekly period. <br /> Hard copy envelopes shall include on the front the task owner name,date range and job <br /> title. <br /> These envelopes shall be retained and transitioned as per the client's needs. <br /> 1111I <br /> I <br /> I <br /> I r <br /> FDC2 Florida Disaster Consulting,LLC <br /> Preparedness-Response-Recovery-Mitigation <br /> I <br />