Laserfiche WebLink
SAMPLE REPORT <br /> FDC <br /> I50P DAILY MONITOR REPORTS <br /> FILL ALL FIELDS IN DAILY MOMITOR REPORT AT START OF WORK <br /> DAY AND DURING MONITORING IN THE FIELD <br /> Populate: <br /> 1. Lead Monitor/Supervisor name (top of report) <br /> 2. Monitor name(top of report) <br /> 3. Date (top of report) <br /> 4. Start time (top of report) <br /> 5. debris type (body of report) <br /> 6. task Owner(Trophy Club)body of report <br /> 7. GPS start <br /> 8. CPS stop <br /> (Note: items 8.And 9.are populated as you follow the debris removal contractor <br /> along points of pick up as location changes) <br /> 9. Debris contractor(enter contractor company name of sub-contractor if applicable <br /> and hrs.crew worked) <br /> 10. Monitor hours (enter hours at each location,example if(4) hrs.were on trail A and <br /> (4) hrs.were at trail B you would have(2) separate entries on your report. See <br /> attachment report example) <br /> Finalizing Daily Monitor Report <br /> i. At the end of the work day go to the top of the sheet and enter the stop time as <br /> well as the total hours for the day worked. <br /> ii. Sign to the right of the Top of the sheet and date and turn into Lead Monitor. <br /> i <br /> FDCFlorida Disaster Consulting, LLC <br /> Preparedness-Response-Recovery-Mitigation <br /> 1 <br />