My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DRC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 18-04-02 Disaster Debris Management and Removal Services
>
Responses
>
DRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2018 2:56:04 PM
Creation date
5/11/2018 10:12:32 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Disaster Debris Management and Removal Services
Bid No. (xx-xx-xx)
18-04-02
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> I The Operations Manager (O.M.) is a member of DRC Senior Management assigned as principal liaison to the client <br /> for each operation. The Operations Manager will henceforth be on call and available to respond to the point of contact <br /> 24 hours a day, 7 days a week throughout the life of the Task Order. The DRC Operations Manager will have full <br /> I electronic linkage to the client via cell phone, satellite phone, internet, and/or two-way radios. The O.M. will have <br /> responsibility for successful completion of a Task Order and is responsible to the client as well as the DRC V.P. <br /> I All Field Supervisors will be assigned sectors or zones within a specific debris area to manage. They will be <br /> responsible for supervising the daily activities of the collection crews working to remove debris. Those <br /> subcontractors/ crews within the sector or zone are to report directly to DRGs field supervisor with any and all <br /> I issues. If these issues require upper management decisions, then the supervisor is to report to the project manager <br /> immediately. The field supervisor communicates with the project manager at a minimum twice per day to update the <br /> project manager of the activity in their particular zone or sector. <br /> The field supervisor works "hand in hand" with the sector safety manager and quality control manager to ensure a <br /> safe and compliant operation in the field. He answers directly to the project manager but is instructed to take action if <br /> I the safety or QC manager raises any safety concerns and has the authority to stop work. Daily and QC reporting is a <br /> primary and important function of the field supervisor; they are to fill out and submit daily reports to the project <br /> ® manager for all activities within that zone on a daily basis. <br /> ® Crew Supervisor will be responsible for individual or a group of crews working within a specific debris zone. The <br /> Supervisor will oversee the actual collection and loading of all debris along with the proper segregation and <br /> identification of various waste streams such as Vegetative,C&D,White goods and III IW.Supervisors are tasked with <br /> directing the individual crews within the zones and their specific zone assignments and ensuring safe traffic control <br /> with the aid of the QC manager and Safety Manager.The crew supervisor handles all zone maps and sub-zone maps <br /> with individual crews. Subcontractors will be assigned zones and crews will subsequently be assigned sub zones; <br /> Icrew supervisors shall distribute these crew maps and manage their production and boundaries within these zones. <br /> Site Managers shall be assigned to each and every site located within any debris mission to include DMS, staging <br /> I sites and final disposal sites. The Site Managers will oversee and direct all unloading, reduction, traffic control, <br /> inspection tower issues, site equipment and trucks. Site Managers report directly to the project manager, but also <br /> communicate with the crew and field supervisors. <br /> IMOBILIZATION <br /> If the storm becomes a threat, 24 48 hours before impact, manpower and equipment are mobilized and staged in a <br /> I safe location near the area of impact. Subcontractors are put on notice, and emergency communications are made <br /> available.Locations for a mobile command center are scouted and chosen based on factors such as proximity to major <br /> troads and severity of impact. <br /> ® Because DRC ES has partnered with major fuel companies and compiled a list of regional emergency diesel and <br /> gasoline suppliers, temporary shortages will not affect operations. Field maintenance/fuel personnel will prepare <br /> I their assigned maintenance/fuel vehicles for deployment in accordance with the appropriate inventory and safety <br /> checklists. <br /> I DRC personnel will ensure, that the command center, if utilized,contains all required equipment and supplies, that <br /> communications have had a full system check and that all required equipment/supplies are in order prior to <br /> departure. Portable power supplies will also be safety inspected and load tested prior to departure. DRC over-the- <br /> I road equipment transports and operators will initially conduct equipment transportation. Additional equipment <br /> transportation will be contracted, as needed, by over-the-road equipment transporters and operators through pre- <br /> established standing agreements. <br /> 1 <br /> DRC <br /> I <br /> — <br /> DRC Emergency Services,LLC 50 EttE NGE CY SEN VI:ES <br /> RFP No.18-04-02 —smxmysser. <br />
The URL can be used to link to this page
Your browser does not support the video tag.