Laserfiche WebLink
0 <br /> • TDSRS will be fully operational • Fully operation plan driving <br /> • Emergency road clearance debris collection, removal, <br /> complete within 70 hours. recording and disposal with <br /> • Full project team to include highest rate of collection Page 18 <br /> subcontractors to be fully within the first 30 days** <br /> operational. • We will expect to be hauling <br /> • Fully updated operational approximately 15-20,000 <br /> plans finalized between KDF cubic yards a day dependent <br /> and Gordon City with specific on the area. <br /> project plan including specifics <br /> of disaster damage, safety <br /> plans and subcontractor <br /> plans. <br /> 72 hours post impact 5 days post impact <br /> z <br /> **This estimate depends on the size and magnitude of the disaster. For the City of Sunny Isles with an <br /> ff estimated Cu Yrd of 5000 this timeline would be significantly shorter with projected termination in 10 <br /> days <br /> Emergency roadway clearance- Cut and Push <br /> Emergency roadway clearance will begin within 24 hours of impact. Prioritizing the main transport <br /> networks to enable emergency traffic, better functioning for the local area and also to enable full <br /> recovery to commence. This includes access to critical structures such as hospitals. This is a time critical <br /> operation but safety of staff and the general public are an essential consideration in this phase. Cut <br /> and push crews will be active with rotating personnel 24/7 and the number of crews will depend on <br /> the size of the disaster with the goal of full emergency push of prioritized networks within 70 hours. <br /> Cut and push crews will be supplied with the appropriate equipment to push the debris to the side of <br /> the road to enable access for emergency traffic. If it is not possible to push debris to the roadside, then <br /> debris will be collected and moved to a temporary debris site. Special plans will be in place to deal with <br /> downed electrical wires and other hazardous conditions. Crew sizes and structure may depend on the <br /> nature and size of disaster but will typically be as follows:- <br /> 1 or 2 Transport trucks (approx. 30 cu yrds) with qualified operator <br /> 2 Qualified flag operators <br /> 2 Groundsmen with chain saws <br /> KDF Enterprises, LLC RFP Disaster Debris Management and Disposal Services 18-04-02 <br />