My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2018-2831
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2018
>
Reso 2018-2831
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2018 3:04:10 PM
Creation date
6/27/2018 2:34:35 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2018-2831
Date (mm/dd/yyyy)
06/21/2018
Description
Awd Bid 18-04-01 for North Bay Road Drainage Improvements to All Webbs Enterprises, Inc.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.4.4 Liquidated damages and costs incurred by the City for extended construction <br /> administration. <br /> 5.4.5 Failure of Contractor to comply with other provisions of this Agreement. <br /> 5.5 Upon receipt of written notice from Contractor that the Work is ready for final <br /> inspection and acceptance, the City will make an inspection thereof. If the City finds the Work <br /> acceptable, the requisite documents have been submitted and the requirements of the Contract <br /> Documents fully satisfied, and all conditions of the permits and regulatory agencies have been <br /> met, a Final Certificate for Payment will be issued by the City, stating that the requirements of <br /> the Contract Documents have been performed and the Work is ready for acceptance under the <br /> terms and conditions thereof. <br /> 5.6 Before issuance of the Final Certificate for Payment, Contractor shall deliver to the <br /> City a complete release of all liens arising out of this Agreement, or receipts in full in lieu thereof, <br /> an affidavit certifying that all suppliers and Sub-Contractors have been paid in full and that all <br /> other indebtedness connected with the Work has been paid, and a consent of the surety to final <br /> payment; and the final bill of materials, if required, and Application for Payment. <br /> Contractor shall deliver the written Contractor's and all Manufacturers' warranties prior to <br /> issuance of the Final Certificate for Payment. <br /> 5.7 If, after the Work has been substantially completed, full completion thereof is <br /> materially delayed through no fault of Contractor, and the City so certifies same, the City <br /> will, and without terminating the Agreement, make payment of the balance due for that portion <br /> of the Work fully completed and accepted. Such payment shall be made under the terms and <br /> conditions governing final payment, except that it shall not constitute a waiver of claims. <br /> 5.8 Final payment shall be made only after the City has reviewed and approved the final <br /> application for payment. The acceptance of final payment shall constitute a waiver of all <br /> claims by Contractor, except those previously made in strict accordance with the provisions of <br /> the Agreement and identified by Contractor as unsettled at the time of the application for final <br /> payment. <br /> ARTICLE 6. REQUESTS FOR INFORMATION (RFI) <br /> The Contractor shall submit in writing.a Request for Information (RFI) to the City where the <br /> Contractor believes that the specifications or drawings are unclear or conflict. All requests <br /> must be submitted in a manner that clearly identifies the drawing and/or specification section <br /> where clarification or interpretation is being requested. <br /> ARTICLE 7. FIELD DIRECTIVES <br /> The City may at times issue Field Directives to the Contractor based on visits to the Work <br /> areas. Such Field Directives shall be issued in writing and the Contractor shall be required to <br /> comply with such directive. Where the Contractor believes that the directive is outside the scope <br /> of the Work, the Contractor shall, within Forty Eight (48) hours, notify the City that the Field <br /> Directive is outside the scope of the Work. At that time the Field Directive may be rescinded or <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.