My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2018-2831
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2018
>
Reso 2018-2831
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2018 3:04:10 PM
Creation date
6/27/2018 2:34:35 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2018-2831
Date (mm/dd/yyyy)
06/21/2018
Description
Awd Bid 18-04-01 for North Bay Road Drainage Improvements to All Webbs Enterprises, Inc.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Punch List means a compilation of items of Construction Work required to be performed by, or <br /> through the Contractor after the Substantial Completion inspection and prior to Final Completion <br /> and payment. <br /> Request For Information (RFI) means a request from the Contractor seeking an interpretation <br /> or clarification by the City relative to the Agreement and/or the Contract Documents. The RFI, <br /> which shall be clearly marked RFI, shall clearly and concisely set forth the issue(s) or item(s) <br /> requiring clarification or interpretation and why the response is needed. The RFI must set forth the <br /> Contractor's interpretation or understanding of the document(s) in question, along with the <br /> reason for such understanding. <br /> Sub-Contractor(s) means a person or entity other than a materialman or laborer that has a <br /> direct contract with the Contractor to perform or supply any portion of the Work in connection <br /> with this Project. <br /> Substantial Completion means that point at which, as certified in writing by the City Manager or <br /> his designee,the Work is at a level of completion in strict compliance with the Contract Documents <br /> such that the City can enjoy beneficial use or occupancy and can use or operate it in all respects, <br /> for its intended purpose. Partial use or occupancy of the Work shall not result in the Work being <br /> deemed substantially complete, and such partial use or occupancy shall not be evidence of <br /> Substantial Completion <br /> Specifications and Plans as used herein means that portion of the Contract Documents which <br /> are the written requirements for the materials, equipment, systems, standards and workmanship for <br /> completion of the Work. <br /> Time for Completion means the time to complete all Work no later than four hundred fifty(450) <br /> calendar days from the Commencement Date specified in the Notice to Proceed issued by the City <br /> Manager or his designee. <br /> Work as used herein refers to all services required by the Contract Documents, including all <br /> labor, materials, equipment, supervision and services needed to complete the Work in <br /> accordance with the Contract Documents. <br /> ARTICLE 1. SCOPE OF WORK <br /> 1.1 Contractor shall provide all labor, materials, equipment, tools, manpower, <br /> management, supervision, and all other necessary goods and services to perform the Work in the <br /> manner required by the Contract Documents. <br /> 1.2 Contractor performing work covered by this contract shall have all applicable licenses <br /> during the term of the contract. The Contractor will be responsible for securing and providing the <br /> Owner or Owner's representatives, proof of all secured permits and operating licenses as required <br /> by state and local agencies for the assigned work. <br /> 1.3 All maintenance, rehabilitation and construction activities will be initiated during the <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.