My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2018-2831
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2018
>
Reso 2018-2831
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2018 3:04:10 PM
Creation date
6/27/2018 2:34:35 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2018-2831
Date (mm/dd/yyyy)
06/21/2018
Description
Awd Bid 18-04-01 for North Bay Road Drainage Improvements to All Webbs Enterprises, Inc.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
following hours: <br /> 1.3.1 Standard time: 7:00 a.m. to 6:30 p.m. Monday through Thursday, 7:00 a.m.to 5:00 <br /> p.m. on Friday, and 9:00 a.m. to 5:00 p.m. on Saturday. <br /> 1.3.2 Daylight saving time: 7:00 a.m. to 7:00 p.m. Monday through Thursday, 7:00 a.m. <br /> to 5:00 p.m. on Friday, and 9:00 a.m. to 5:00 p.m. on Saturday. <br /> 1.3.3 No construction activities shall take place on Sunday and on the following <br /> holidays:New Year's Day, Fourth of July, Labor Day, Yom Kippur,Thanksgiving <br /> Day, and Christmas Day. <br /> ARTICLE 2. CONTRACT TIME, TIME FOR COMPLETION AND LIQUIDATED <br /> DAMAGES <br /> 2.1 Time is of the essence in the performance of the Work under this Agreement. The <br /> Commencement Date shall be the date specified in the Notice to Proceed issued by the City <br /> Manager or his designee. Contractor shall mobilize to the site and be actively performing the scope <br /> of Work in accordance with the Contract Documents within ten (10) calendar days after the <br /> issuance of a Notice to Proceed. Contractor shall perform the Work in accordance with the Contract <br /> Documents and shall achieve Final Completion of the Work no later than Four Hundred Fifty <br /> (450) calendar days from the Commencement Date specified in the Notice to Proceed issued by <br /> the City Manager or his designee ("Scheduled Final Completion Date"). <br /> 2.2 Contractor shall complete all applications for the Permits, and submit all required <br /> documents, including but not limited to the Bonds and the Insurance Certificate, within ten (10) <br /> calendar days after issuance of a Notice to Proceed by the City. In the event Contractor fails to <br /> deliver to the City the required documents within ten (10) days after issuance of a Notice to <br /> Proceed, or fails to apply for the Permits within ten (10) days after issuance of a Notice to <br /> Proceed, or fails to commence Work by the date specified in the Notice to Proceed issued by the <br /> City Manager or his designee, then Contractor shall be in default. In such event the City, in <br /> addition to all remedies provided for an event of Contractor's default hereunder, shall have the <br /> right to collect from Contractor all expenses incurred by the City in the re-procurement of the <br /> Work. <br /> 2.3 Time is of the essence throughout this Agreement. <br /> 2.4 "Substantial Completion"of the entire Work shall be achieved no later than Four Hundred <br /> One (400) calendar days from the commencement date specified in the Notice to Proceed issued <br /> by the City Manager or his designee ("Scheduled Substantial Completion Date"). <br /> 2.5 Contractor understands that if the Substantial Completion is not attained by the scheduled <br /> Substantial Completion Date, City will suffer damages which are difficult to determine and <br /> accurately specify. Contractor agrees that if Substantial Completion is not attained within the <br /> Scheduled Substantial Completion Date then Contractor shall pay the City One Thousand Five <br /> Hundred Eighty Four Dollars (S1,584.00) as liquidated damages per day for each calendar day <br /> that extends beyond the Scheduled Substantial Completion Date: Additionally, if the Contractor <br /> fails to achieve Final Completion within fifty (50) days of the date of Scheduled Substantial <br /> Completion Date, the Contractor shall pay to City, in addition to the liquidated damages for <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.