My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CSIB-98073000
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(0098-07-30) City of SIB Government Center, Police Facility and Library
>
CSIB-98073000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2013 2:17:54 PM
Creation date
3/25/2013 11:09:59 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Government Center
Bid No. (xx-xx-xx)
98-07-30
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D/B Related Building Experience Form <br /> (Make copies of this form and utilize them to list design-build projects - Submit one form per project) <br /> 1. Name and location of project: NAVY LODGE ADDITION,NAS, PENSACOLA,FLORIDA <br /> 2. Nature of firm's responsibility on this project: (mark only one box) <br /> ❑ Construction Manager at-risk (with Gurantee Maximum Price) <br /> ❑ General Contractor ❑ Construction Manager <br /> Design - Build ❑ Other <br /> 3. Project owner's representative (architect or engineer): <br /> Name: U. S. NAVY,(POC)CMDR.BRIAN HARRIS, <br /> Address: NAS,PENSACOLA,FLORIDA <br /> Current phone Number ( 850 ) 452-4616 <br /> 4. Project user/agency's representative (owner): <br /> Name: U. S.NAVY,(POC)CMDR.BRIAN HARRIS, <br /> Address: NAS,PENSACOLA,FLORIDA <br /> Current phone Number ( 850 ) 452-461 <br /> 5. Date project was completed or is anticipated to be completed 6 ./ 30 / 00 <br /> 6. Size of project (Gross square footage of construction) 20,000 qsf <br /> 7. Cost of project (Construction cost): $ 3,370,064.00 <br /> 8. Work for which the staff (employees) was responsible: Concrete Work,Misc.Metals,Carpentry, <br /> Doors,Frames,Hardware,Framing,Drywall and Specialties. <br /> 9. Present status of this projectPROJECT IN PROCESS <br /> 1 0. P. M. and other key professionals involved on listed project: (Check box if assigned to this pmiect) <br /> CRAIG COLLIGAN,PROJECT EXECUTIVE JOHN MAYER, ESTIMATOR/SCHEDULING <br /> Ejl WILLIAM SIMMONS,PROJECT MANAGER ❑ <br /> MONTY EDDINS, SUPERINTENDENT ❑ <br /> Revised June 30,1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.