Laserfiche WebLink
D/B Related Building Experience Form <br /> (Make copies of this form and utilize them to list design-build projects - Submit one form per project) <br /> 1 Name and location of project: CBQ-RENOVATE BACHELORS QUARTERS, NAS, KEY WEST, FL. <br /> 2. Nature of firm's responsibility on this project: (mark only one box) <br /> ❑ Construction Manager at-risk (with Gurantee Maximum Price) <br /> ❑ General Contractor ❑ Construction Manager <br /> El Design - Build a Other SUBCONTRACTOR <br /> 3. Project owner's representative (architect or engineer): <br /> Name: SAUER,INC. <br /> Address: 11223 PHILLIPS PARKWAY DR.,E. JACKSONVILLE,FL 32256 <br /> Current phone Number: ( 843 ) 820-5979 <br /> 4. Project user/agency's representative (owner): <br /> ® Name: U. S.NAVY,(POC)ENSIGN BRIAN CLAPP <br /> Address: NAS,KEY WEST,FLORIDA <br /> Current phone Number: ( 305 ) 293-3499 <br /> 5. Date project was completed or is anticipated to be completed 10 . / 7 / 00 <br /> 6. Size of project (Gross square footage of construction): 143,685 qsf <br /> 7. Cost of project (Construction cost): b 4,186,916.00 <br /> 8. Work for which the staff (employees) was responsible: Demolition,Concrete Work,Misc.Metals, <br /> Carpentry, Interior Finishes,Doors, Frames,Hardware,and Specialties. <br /> 9. Present status of this projectYROJECT IN PROCESS <br /> 1 0. P. M. and other key professionals involved on listed project: (Check box if assigned to this project) <br /> CRAIG COLLIGAN, PROJECT MANAGER CEI JOHN MAYER, ESTIMATOR/SCHEDULING <br /> ® 0 ROBERT E. COLLIGAN, SUPERINTENDENT ANDRELL GIBBONS, ASSISTANT SUPER. <br /> El FREDERICK E. McINTOSH, QUALITY CONTROL ❑ <br /> Revised June 30,1999 <br />