Laserfiche WebLink
P4( HEWETT-KIER CONSTRUCTION, INC. GENERAL CONTRACTORS <br /> 2. The level of detail for the design and construction schedule would be task loaded. The time <br /> allocated to each task including design, design approval, subcontractor's submittals, <br /> submittal approval, material procurement, and General Contractor self performed work. <br /> 3. At project start up Hewett-Kier Construction, Inc. meets with major subcontractors and the <br /> design team, and a_rough schedule is developed as a result of this meeting with all <br /> participants. <br /> 4. Hewett-Kier Construction, Inc. has been developing project schedules with their own <br /> capabilities since 1987. We started out with DLW info system and since 1996 have used <br /> Primavera P-3 Project Planner. Craig Colligan has seven years experience in designing <br /> projects schedules and John Mayer has twelve years experience. These individuals will <br /> develop the Schedule. <br /> 05. Hewett-Kier Construction,Inc.individuals listed above in Item four,have been cost loading <br /> Schedules since 1987. These individuals will cost load this project along with the Project <br /> Manager Al(anales. <br /> 6. See samples attached. <br />