Laserfiche WebLink
.ER CONSTRUCTION, INC. JOBCOST TURD 3/30/98 1 <br /> • 4/20/90 <br /> 10:08:14 <br /> ORIGINAL CU3RIST CURRENT TOTAI. t BALANCE TO <br /> BWt,_I &VOCE] COSTS COSTS COMPL COMPLETION <br /> JOB: 232 PUBLIC SAFETY FACILITY <br /> 01000 GENERAL CONDITIONS <br /> 3-M 14,824.00 14,824.03 417.59 655.75 4.42 14,168.21 <br /> 4-1. 94,268.00 94,255.01 1,790.57 1,750.57 1.9C 92.477.41 <br /> S.E 13,000.00 13,030.03 0.00 0.0C 13.000.00 <br /> 6-5 21,160.00 21,160.01 0.00 0.0C 21.160.00 <br /> TOT 143,252.00 143,252.03 2,208.16 2,446.36 1.71 140,805.64 <br /> 01260 EAATBNORK <br /> 6-5 58,897.00 58,097.03 0.00 0.0C 58,697.00 <br /> TOT 68,877.00 58,637.03 0.00 0.00 58,897.00 <br /> 02510 WALK, ROAD 4 PARKING PAVI <br /> 6-5 66,930.00 66,930.03 0.00 0.0C 66,930.00 <br /> TOT 66,930.00 66,930.03 0.00 0.0C 66,930.00 <br /> • <br /> 02516 BRICK PAVERS <br /> 6-5 20,447.00 20,447.03 0.00 3.00 20.447.00 <br /> TOT 20,447.00 20,447.03 0.00 0.0C 20.447.00 <br /> UTILITIES <br /> 6-5 57,000.00 57,630.C3 0.00 3.06 57,000.00 <br /> TOT 57,000.00 57,000.00 0.00 0.00 57,000.00 <br /> 02810 ILRICAT_ON SYSTEMS <br /> 6-5 17,686.00 17,656.03 0.00 0.01 17,686.00 <br /> TOT 17,686.00 17,696.03 0.00 0.00 17,686.00 <br /> 02830 FENCES. GATES 4 BARRICADE <br /> 6-5 35,600.00 35,600.00 0.00 0.0C 35,600.00 <br /> TOT 15,600.00 35.600.03 0.00 0.00 35,600.00 <br /> 02900 LANDSCAPING <br /> 3-M 60C.00 600.00 C.00 0.00 600.00 <br /> 6-S 41,875.00 61,575.00 C.00 0.00 61.175.00 <br /> TOT 62,475.00 62,475.00 C.00 0.00 62,475.00 <br /> 03030 COFCRS-TT <br /> 6-5 350,007.00 350,000.30 0.00 0.03 35C.000.00 <br /> TOT 350,003.00 350,000.30 0.00 0.C3 350,000.00 <br /> 04C00 MASCNRY <br /> 3-n 13.000.00 10,000.00 3.00 0.00 10,000.00 <br /> E-S 103,5E1.00 103,561.00 3.0C 0.00 102.561.00 <br /> TOT 113,5E1.00 113,561.00 3.0C 0.30 :13.561.00 <br />