Laserfiche WebLink
S. Constructability Analysis: Craig Colligan, John Mayer, and Joe Butler and <br /> major subcontractors will join with the architects staff and the various engineering <br /> disciplines during the 50% and 90% drawing stages to review the practicality of <br /> constructing the proposed design and suggest simpler and cheaper ways of <br /> assembling the building. <br /> 9. Cost Control : The most important component of our design team or any design- <br /> build process is the ability to associate the design with the cost in the early stages <br /> of the project were cost is impacted the most. Craig Colligan, John Mayer, and <br /> Joe Butler will develop and maintain a detailed cost budget throughout the project <br /> and reevaluate the cost impacts of design changes and unforeseen construction <br /> conditions. <br /> 10. Project Closeout: The project closeout will be performed before the actual <br /> completion of the job by detailed record keeping by the project managers and the <br /> project architects and engineers. Our team has many years of experience doing <br /> public and federal work with very exacting requirements. <br /> 11. Transition Planning: The main objective of the project is to provide a smooth <br /> transition from the construction phase to children actually attending classes in <br /> ® these facilities. Our staff has extensive experience in this area and will work <br /> closely with the school administers during the final stages of the project to work <br /> the best sequence of class schedules, safety, furniture moving, and final cleaning. <br /> 12. Security Systems: Our experience in public construction has provided us with a <br /> extensive background in security systems and a pool of specialty subcontractors <br /> to rely upon to evaluate the security needs of the children attending school in <br /> these facilities. <br />