My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CSIB-98073000
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(0098-07-30) City of SIB Government Center, Police Facility and Library
>
CSIB-98073000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2013 2:17:54 PM
Creation date
3/25/2013 11:09:59 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Government Center
Bid No. (xx-xx-xx)
98-07-30
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FROM :U6-DEPT-COMMERCE-NOAR 816 426 7530 19%.06-06 15:4S V8 <br /> 24 P.04/06 <br /> forecasting and computer equipment had to be installed before the facility was operational. The <br /> contractor was willing to go the extra mile in accommodating the Government by completing <br /> work in rooms located in various parts of the building so furniture, equipment and wiring could be <br /> installed simultaneously during completion of other building areas. <br /> The contractor's proposals for changes in work-were submitted timely and usually at reasonable <br /> cost. Submittals, shop drawings, payrolls, payment requests, daily logs and other documentation <br /> required under the contract were always submitted in a timely manner. When problems were <br /> encountered, the contractor proposed solutions to the Government for consideration. When <br /> directed to proceed with work, he did so without hesitation. Even after acceptance of the facility <br /> by the Government, the contractor proceeded with diligence to complete the punch list and still <br /> :ontinued to aggressively respond to warranty%gsnes without complaint. <br /> This contractor is one a of very few construction contractors that I would look forward to <br /> working with on another larger construction project. His professionalism in contract management <br /> and quality of workmanship is far superior to the norm Ills efforts to work as a team both with <br /> the Government, the design firm and his subcontractors has truly earned him the Partners in <br /> Quality Conrracting Award. <br />
The URL can be used to link to this page
Your browser does not support the video tag.