Laserfiche WebLink
FROM US-DEPT-CCImMERCE-tom 816 426 7530 1996.06-06 15:46 tt <br /> 824 P,05/06 <br /> • <br /> PART 17T: '✓alidation/Assessment <br /> When completing this section, please review the contractor's application and verify that the <br /> ':ontrai tor's description of the effort is accurate. In addition, please note any outstanding aspects <br /> of the contractor's performance. (If these aspects have been noted in the previous section, please <br /> do not repeat them here.) If additional space is needed;please use a separate page and attach the <br /> continuation page. <br /> The contractor's application has been reviewed fpr accuracy and found to be complete and <br /> acceptable. if anything, this office feels the Prime Contractor, Hewett-Kier Construction, Inc., <br /> has "downplayed" somewhat the importance of-their firm's contribution to the overall success of <br /> this project. The following information is provided to further substantiate the significance of <br /> Hewett -Kier's accomplishments. <br /> from the vet), start of this construction project, the philosophy of a Government-Contractor <br /> "Team" approach was emphasized by the Contracting Officer to all parties involved. Hewett - <br /> Kier took this charge seriously and from the very beginning acted as a full partner in bringing this <br /> highly complicated, "short fuse" Construction Project to completion on schedule in time for the <br /> arrival of the 1995 hurricane season. <br /> One example of the contractor's "proactive" involvement in this project that was not mentioned in <br /> their application was when their mechanical sub-contractor missed some very important <br /> cnuineering shop drawing submission dates. Hewett -Kier moved quickly to determine the cause <br /> of the sub's nonresponsiveness and elected to replaced them with to maintain the construction <br /> schedule.. This rapid decision proved very important to getting the essential heating, ventilation <br /> and air conditioning (HVAC) portion of the project back on track. <br /> This office feels that without the full cooperation and active participation as a"team" member by <br /> Hewett - Kier Construction, this vitally important (public safety) project, might have easily missed <br /> l:,cine ready for the 1995 Hurricane season, and as everyone is probably aware, the 1995 <br /> Hurricane season proved to be one of the most "active" in the history of record keeping. <br /> In Iiuht of the medley of"challenges" faced (short time frame, construction changes, weather, <br /> subcontractor problems, etc.) and ultimately resolved, the successful, on-time completion of this. <br /> project by Hewett - Kier Construction, inc., was an outstanding accomplishment and worthy of <br /> recounition. <br />