My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CSIB-98073000
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(0098-07-30) City of SIB Government Center, Police Facility and Library
>
CSIB-98073000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2013 2:17:54 PM
Creation date
3/25/2013 11:09:59 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Government Center
Bid No. (xx-xx-xx)
98-07-30
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H [ HEWETT-KIER CONSTRUCTION, INC. GENERAL CONTRACTORS <br /> 0 <br /> With a bonding capacity of over$65 million and work on hand totaling approximately $13 million, Hewett- <br /> Kier Construction, Inc. is operating at less than 20%of its available capacity. <br /> As a contractor who has specialized in government construction since its inception in 1977 to this date, <br /> Hewett-Kier Construction, Inc. has continuously updated and improved its management personnel and <br /> techniques. Hewett-Kier Construction, Inc. has the resources available and the ability to successfully perform <br /> in this project. <br /> The following is a description of Hewett-Kier Construction, Inc.'s construction management program: <br /> The construction department is headed by Craig Colligan, the Vice President of Hewett-Kier Construction, <br /> Inc. Currently there are four project managers working directly under Mr. Colligan. <br /> It is the project manager's responsibility to ensure the timely completion of the project and to ensure that all <br /> paperwork requirements are met such as submittals, Requests for Information and change orders. In addition, <br /> the project manager helps prepare the CPM and attends the jobsite coordination meetings held, at a minimum, <br /> bi-weekly at the jobsite. The project manager constantly monitors the projects for which he is responsible <br /> and directs the superintendent as needed. Each project manager is provided with a company truck and <br /> ® computer to facilitate his job. <br /> Each project has a superintendent assigned to it full time. The superintendent is at the jobsite ever day work <br /> is being performed. It is his responsibility to supervise Hewett-Kier Construction, Inc.'s forces as well as <br /> those of its subcontractors. When work is being performed by a subcontractor, Hewett-Kier Construction, <br /> Inc. requires that subcontractor to name, in writing, it's foreman or superintendent who must be onsite when <br /> their work is being performed. Hewett-Kier Construction,Inc.'s superintendent deals only with this individual <br /> in directing the subcontractor's work. <br /> The superintendent is in charge of job quality, insuring that the work is performed properly and that the proper <br /> materials are being used. The superintendent answers directly to the project manager and is required to inform <br /> the project manager daily as to job progress. <br /> Depending on the size of the project, Hewett-Kier Construction, Inc. utilizes either an on-site project engineer <br /> or one that is in a centralized location and responsible for several projects. The project engineer is responsible <br /> for expediting and reviewing submittals and for inputting this information in Hewett-Kier Construction, Inc.'s <br /> project management software. The project engineer works with the superintendent to help expedite the project <br /> and under the supervision of the project manager. When working on only one project, the project engineer <br /> also performs quality control functions.. <br /> Software utilized for project management are: <br /> leExcel spreadsheet - for listing correspondence, logs, tool inventory and job logs <br /> Super Prolog Plus - Project Management Software - This software is used for submittal logs, submittals <br /> transmittals, Requests For Information, change order logs,daily reports and non-compliance notices and logs. <br /> With this software Hewett-Kier Construction, Inc. is able to immediately determine the status of any of the <br /> above items and develop "hot lists" of items needing constant monitoring. <br />
The URL can be used to link to this page
Your browser does not support the video tag.