My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2038
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2013 3:44:49 PM
Creation date
3/26/2013 9:38:00 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2038
Date (mm/dd/yyyy)
03/21/2013
Description
Agmt w/Bermello Ajamil & Partners Prof Srvs for Intracoastal Parks Pro
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FT <br />23. The City agrees that B &A shall not be required to provide detailed backup, in the form of <br />hourly detail of any kind, in support of invoicing for fixed fee or lump sum fee projects. If <br />backup is required the City agrees to pay B &A, on an hourly basis, for the cost of <br />providing such additional information. <br />PART V - PROJECT SCHEDULE <br />B &A is prepared to begin work on the project immediately upon receipt of this executed Scope <br />of Services. B &A, in consultation with the City, shall perform its work in such a manner as to <br />comply with an agreed upon schedule. <br />PART VI - COMPENSATION <br />Parts I through III - B &A shall bill the City a lump sum fee for each Part of the Scope of Services as <br />listed below. Direct expenses shall be billed in addition the fee. Reimbursable expenses will be <br />itemized and billed at actual costs and include, but not be limited to, photocopies and printing, <br />postage and shipping, long distance telephone, faxes and all travel related expenses. Expenses <br />and trips associated with travel to the project site will be billed as reimbursable expenses. <br />Part I Pre - Design $23,300.00 <br />Part II Preparation of Construction Documents $46,250.00 <br />Part III Bid Form and Bidding Assistance $ 4,250.00 <br />Reimbursable Expenses $ 2,200.00 <br />Total: $76,000.00 <br />F <br />I. <br />Construction Services <br />2. <br />Marine Engineering Services <br />r <br />3. <br />Renderings, illustrative or presentation graphics <br />�. <br />4. <br />Public meetings or presentation related to the previously completed Master Plan <br />+ <br />rendering <br />5. <br />Meetings with City staff and or elected officials <br />6. <br />Design Intent Meeting <br />7. <br />Water Use Permit Application (SFWMD or DERM) <br />8. <br />Irrigation well design and any associated Electrical Design (Fees based on use of potable <br />water for Irrigation) <br />9. <br />Lighting design above and beyond security lighting <br />10. <br />Landscape up lighting design <br />11. <br />Potable water supply design <br />12. <br />Sanitary sewer design <br />13. <br />Architectural design services including pavilions, trellises or pergolas <br />14. <br />Detailed written technical specification sections <br />_ <br />15. <br />FDEP or FFWCC Permitting <br />16. <br />Signage design <br />17. <br />Design work within the Poinciana Drive right -of -way <br />18. <br />Bidding Assistance <br />19. <br />Project Schedule <br />20. <br />Soft dig exploratory excavation to determine vertical profile of existing utilities <br />21. <br />Plotting of easements and other items available only from a title search <br />22. <br />Surveying painted marks on the surface of the ground or pavement to delineate <br />underground utility locations which would be marked out by a professional utility locates <br />firm <br />23. The City agrees that B &A shall not be required to provide detailed backup, in the form of <br />hourly detail of any kind, in support of invoicing for fixed fee or lump sum fee projects. If <br />backup is required the City agrees to pay B &A, on an hourly basis, for the cost of <br />providing such additional information. <br />PART V - PROJECT SCHEDULE <br />B &A is prepared to begin work on the project immediately upon receipt of this executed Scope <br />of Services. B &A, in consultation with the City, shall perform its work in such a manner as to <br />comply with an agreed upon schedule. <br />PART VI - COMPENSATION <br />Parts I through III - B &A shall bill the City a lump sum fee for each Part of the Scope of Services as <br />listed below. Direct expenses shall be billed in addition the fee. Reimbursable expenses will be <br />itemized and billed at actual costs and include, but not be limited to, photocopies and printing, <br />postage and shipping, long distance telephone, faxes and all travel related expenses. Expenses <br />and trips associated with travel to the project site will be billed as reimbursable expenses. <br />Part I Pre - Design $23,300.00 <br />Part II Preparation of Construction Documents $46,250.00 <br />Part III Bid Form and Bidding Assistance $ 4,250.00 <br />Reimbursable Expenses $ 2,200.00 <br />Total: $76,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.