My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2039
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2014 10:49:01 AM
Creation date
3/26/2013 9:42:19 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2039
Date (mm/dd/yyyy)
03/21/2013
Description
Agmt w/Bermello Ajamil & Partners Prof Srvs for Arlen House Pro
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />i� <br />i <br />Geotechnical Services -The B &A Team will perform field investigation and laboratory testing and <br />will provide geotechnical engineering evaluations and recommendations for the related <br />construction. The geotechnical services will include the review of any existing data available <br />pertaining to the proposed improvements such as the Soil Survey of Miami -Dade County Area, <br />Florida, published by the United States Department of Agriculture (USDA), and the USGS <br />quadrangle survey map for the project vicinity. This data will be supplemented with additional <br />geotechnical explorations and laboratory testing programs and will be used for performing <br />geotechnical- engineering analyses in order to provide recommendations for the proposed <br />improvements. A total of three (3) SPT borings will be performed. Given the presence of organic <br />soils (muck) that exist at depth in the area of the project, we recommend performing the SPT <br />borings to depths of 25 feet below existing grades. The SPT borings will be performed utilizing a <br />truck - mounted drill rig. The SPT boring procedure will be performed in accordance with ASTM D- <br />1586. We understand that the site has access for geotechnical drilling equipment. We will <br />perform a limited number of laboratory classification tests to confirm the visual classification of <br />the soil samples. The laboratory testing will include moisture content. percent passing the No. 200 <br />sieve, grain size analysis, organic content determination, Atterberg limits testing and corrosion <br />series testing. <br />Defiverables for Part 1 Pre- Design -As a result of these tasks, B &A shall produce the following: <br />Two (2) 8 %:" X I I" black and white signed and sealed Engineering Soil Evaluation <br />Reports: <br />PART II - PREPARATION OF CONSTRUCTION DOCUMENTS: $35,400.00 <br />30% Construction Drawings - Based on the master plan approved by the City under previous <br />Authorization, B &A will prepare construction drawings that further illustrate and define the <br />elements and character illustrated there to. Drawings vdll, at a minimum, define proposed <br />drainage concept, illustrate finish, scale and proportions of the screen wall and columns, define <br />lighting fixtures and tentative locations, define sidewalk paving pattern, provide proportions and <br />finish of Arlen House driveway, illustrate automatic gate system. define plant palette and <br />location by type (palm, ornamental, shrubs. etc.). B &A will provide a list of anticipated <br />regulatory permits along with descriptions of actions or information required from the City. This <br />will include appropriate draft regulatory permit applications. <br />30% Opinion of Probable Cost - B &A shall prepare an estimate of probable cost for elements <br />detailed in the 30% Construction Drawings. <br />30 %, City Review Meetings - B &A will attend one (1) meeting with the City to review the progress <br />of the construction documents as well as the Draft Regulatory Permit Applications. The City will <br />provide B &A one (1) consolidated list of comments or changes. Minor revisions will be <br />incorporated into the documents during the next phase of work. Major changes that represent <br />a significant departure from the original design program, budget, and approved master plan <br />shall be completed on a time and material basis. B &A will prepare and distribute, via e-mail, <br />minutes from the 30% review meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.