Laserfiche WebLink
Task III—Data Analysis and Reports <br /> 1. Traffic Memorandum -CGA will summarize the traffic data collection, intersection <br /> capacity analysis and crash analysis in a traffic memorandum for submittal to the City of <br /> Sunny Isles Beach. This scope of services includes one revision based on a comprehensive <br /> review by the City of Sunny Isles Beach. <br /> 2. Prepare illustrations of the existing conditions and the summary findings report to serve as <br /> a basis for design studies relative to regulatory and physical constraints, opportunities for <br /> enhancing the quality and experience of the project, and identifying potential uses, <br /> programming and themes to be incorporated into the design. Required clearances for <br /> vehicular traffic and its impact on the proposed elevations of the overpass will be assessed. <br /> 3. Conduct a peer review of the existing surveys for both Samson Oceanfront Park and the <br /> southwest corner of 174th Street and Collins Avenue to include the review of such items <br /> as sidewalks, edge of pavement, pavement striping,pavers, walls,concrete, pedestrian <br /> crosswalks, curbing, and visible above ground utilities. Visible above ground utilities refer <br /> to the visible structures (e.g., manholes, valve boxes, inlets, etc.)typically associated with <br /> storm drainage, sanitary sewer, potable water, electric, gas, telephone and cable television. <br /> Deliverable:Revisions to Traffic Memorandum Summary, preparation of existing <br /> conditions illustrations and peer review of surveys. <br /> Task IV—Conceptual Design Reports <br /> 1. Prepare preliminary design illustrations in coordination with City staff, sketches and <br /> illustrations to explore and develop a site plan, sections, 3d model and conceptual design <br /> detailing for the park overpass. The preliminary design illustrations will include the <br /> necessary graphics to convey the design and experience of the proposal being presented. <br /> 2. Prepare a Preliminary Conceptual Design Package (Graphics and Brief Summary Memo) <br /> to be issued to the City for review and comment. <br /> SAC #2—Meeting to review the contents of the Preliminary Conceptual Design Package, <br /> discuss the proposed improvements and get input for further design direction for <br /> finalization of the concept design. <br /> 3. A Workshop will be held at which the Conceptual Design will be presented. Community <br /> feedback will be taken in order to incorporate the feedback into the final conceptual <br /> design. <br /> Deliverable:Preliminary design illustrations, SAC #2 meeting minutes and Workshop <br /> meeting minutes to reflect outcomes from community input. <br /> Task V—Conceptual Design Renderings <br /> 1. Based on City and Workshop review comments CGA will produce no more than one (1) <br /> Page 15 <br /> Interlocal Agreement Sunny Isles Beach 174th St Pedestrian Bridge Planning Study FY 2019 <br />