My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFQ 18-08-01 Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
RFQ 18-08-01 Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 2:19:04 PM
Creation date
8/10/2018 2:17:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach |Request for Qualifications No. 18-08-01 19 <br /> <br />3.4 CITY ENGINEER <br />All communications and correspondence shall be directed to the City Engineer and appointment <br />project manager. <br />3.5 DESIGNATED PERSONNEL <br />The Applicant Firm shall designate the personnel according to the organization chart submitted <br />along with proposal, indicating who will be assigned specifically to the performance of this work. <br />At the time of negotiation for entry into a formal contract, the City shall have the right to specify <br />those key project personnel for whom the successful firm assigns to the project. Firm shall not be <br />allowed to substitute other personnel without prior written permission of the City Manager. <br />END OF SECTION <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.