Laserfiche WebLink
CONSULi ANi /CONTRACTOR <br />ORlG\NAL <br />Continuing Professional Services Agreement <br />Contract No. 14919 <br />Procurement No. 13-14-403 <br />For <br />General Engineering Services <br />This Agreement ("Agreement") is made by and between the CITY OF WEST PALM BEACH, with an <br />address of P.O. Box 3366, West Palm Beach , FL 33402-3366 (the "City") and <br />ERDMAN ANTHONY OF FLORIDA, INC., a Florida corporation, with a principal address of 1402 Royal Palm <br />Beach Boulevard, Suite 500, Royal Palm Beach, FL 33411 (the "Consultant"). <br />AREAS OF QUALIFICATION: <br />105. Storm Sewer Design <br />106. Water Distribution, Sewer Collection <br />107. Lift and Pump Station Design <br />111. Community Parks <br />113. Neighborhood Improvements <br />119. Civil Engineering <br />SECTION 1 -SCOPE OF SERVICES <br />The Consultant agrees to provide to the City general engineering and consulting services relating to the Areas <br />of Qualification listed above. <br />Professional Services will be rendered in response to periodic written work authorizations issued by the City <br />on an as-needed basis, in accordance with Section 1.9. Each work authorization will be subject to scope <br />definition and fee negotiation, at the established hourly rates. This shall be a continuing services agreement in <br />accordance with Sec. 287.055, Florida Statutes. No assignment, minimum amount of professional service or <br />compensation is guaranteed under this Agreement. <br />1.1 Phases of Professional Services <br />The services provided under this Agreement ("Professional Services" or "Services") intended to be <br />compensated by the Fees shall be categorized into the following phases of service, as applicable. Consultant <br />shall utilize the following categories in describing scope(s) of services under work authorizations: <br />1. Pre-Design Analysis (or Study/Report Phase, if applicable) <br />2. Preliminary Design Phase and Estimated Construction Costs <br />3. Final Design and Construction Documents Phase and Estimated Construction Costs <br />4. Permitting Phase <br />5. Bidding and Negotiation Phase <br />6. Construction Administration Phase <br />1.2 Pre-Design Analysis (or Study/Report) Phase <br />If the scope of Professional Serv;ces, as detailed in a work authorization, includes pre-design analysis <br />or preparation of study/report, the Consultant shall: <br />1.2.1 . Consult with the City regarding the requirements and budget allocations for the scope of <br />services and review available data; <br />1.2.2. Advise the City as to the necessity of any additional services from other technical <br />Form -PSA CCNA Master 091914 <br />Erdman Anthony-14919 <br />101114 <br />1