My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Erdman Anthony of Florida, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Erdman Anthony of Florida, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 4:43:48 PM
Creation date
9/4/2018 4:38:39 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br />Construction Phase <br />Bidding 3 months <br />Contractor submittals/set up 2 months <br />Construct conduits 5 months Summer time work Repair pavement and pull wires 3 months <br />Install service lines 4 months <br />Deactivate and remove overhead 3 months Summer time work Restoration 1 month <br /> <br />We typically undertake a citywide underground conversion project from the downtown area where the <br />homes and businesses are the most dense and work out to the edges. However, the City is unique with <br />residential uses. For the City, we recommend that the principal services along the two north/south <br />roadways be completed first and then the residential streets with rear yard services be undertaken. <br /> <br />We have thought through our approach to assigning staff to complete the projects on schedule. We <br />anticipate the following staff will complete the work for the City: <br /> <br />Lead staff responsible for core components of each project: <br /> <br />Role Professional Firm <br />Project Manager Dana Gillette, PE, PSM, LEED AP Erdman Anthony <br />Quality Control Manager Dan Ziemianski, PE Erdman Anthony <br />Easement Documents City Attorney <br /> <br />Geotech Hugo Soto, PE Terracon <br />Utility Locates/Coordination Dan Checchia Keith & Associates <br />Survey Bryan Merritt, PSM Erdman Anthony <br />Base Maps Allen Kull Mead & Hunt <br />Utility Negotiation Anthony Hansen, PE Patterson & Dewar <br />Conduit Design Plans David King, PE Mead & Hunt <br />Drainage Design Kevin Barnes, PE Mead & Hunt <br />Street Lighting Nisar Khan, PE, PhD Erdman Anthony <br />Roadway Design Scott Edgar, PE Erdman Anthony <br />Landscape Architecture Paul Weinberg, PLA, ASLA Keith & Associates <br />Public Outreach <br /> <br />City of Sunny Isles Beach <br />Permits Phoebe Cuevas-Molina, PE, <br />LEED AP, BD+C <br />Erdman Anthony <br />Bidding and Construction <br />Management <br />Susan Dalton, PE Erdman Anthony <br />Construction Inspection Dane Dussie Erdman Anthony <br /> <br />Lessons Learned <br />Our team has an extensive working background with municipalities and utility companies on similar <br />projects. By working through utility conversions on past projects, we are familiar with the types of
The URL can be used to link to this page
Your browser does not support the video tag.