|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />
<br />12. NAME
<br />Daniel J. Ziemianski, PE
<br />
<br />13. ROLE IN THIS CONTRACT
<br />Principal in Charge
<br />14. YEARS EXPERIENCE
<br />
<br />a. TOTAL
<br />35
<br />
<br />b. WITH CURRENT FIRM
<br />21
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Erdman Anthony of Florida, Inc., Buffalo, NY
<br />
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />BSCE/Civil Engineering
<br />
<br />17. EDUCATION (DEGREE AND SPECIALIZATION)
<br />NY/ Professional Engineer
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />A registered PE with 35 years of experience, Mr. Ziemianski is a Vice President and Civil Engineering Core Business Leader at Erdman
<br />Anthony. He has managed significant multi-disciplinary projects for a variety of public and private clients, and has extensive experience
<br />in the technical and economic feasibility evaluation of alternative design configurations. Dan is a recent graduate of the ACEC Senior
<br />Executives Institute. In addition, his efforts on behalf of local agencies earned him the Meritorious Service Award from the American
<br />Public Works Association.
<br />19. RELEVANT PROJECTS
<br />a
<br />
<br />(1) TITLE AND LOCATION (City and State)
<br />Yacht Harbor Neighborhood Improvements
<br />Singer Island, FL
<br />
<br />(2) YEAR COMPLETED
<br />
<br />PROFESSIONAL SERVICES
<br />2017
<br />
<br />CONSTRUCTION (If Applicable)
<br />Ongoing
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Erdman Anthony is providing engineering services to design the rehabilitation program for pavements, water, sewer, and draina ge
<br />systems. Services to be provided include civil design to add water quality treatment in the form of exfiltration trenches, to analyze
<br />the size of the outfall pipes, and to interconnect the drainage network to improve its function. Services also involve the de sign of
<br />outfall control structures along with the associated permitting as needed to upgrade the existing drainage system. Th e project also
<br />involves roadway reconstruction. Mr. Ziemianski serves as Principal in Charge.
<br />b
<br />
<br />(1) TITLE AND LOCATION (City and State)
<br />Grandview Heights Neighborhood Improvements
<br />West Palm Beach, FL
<br />
<br />(2) YEAR COMPLETED
<br />
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />
<br />CONSTRUCTION (If Applicable)
<br />
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />The project includes a full depth reconstruction of the roadways, replacement of curb/gutters and sidewalks, and replacement of
<br />watermains. The existing asbestos-cement watermains will be grout filled and abandoned in place. New water service lines will be
<br />installed to the existing meters in the sidewalks. Our design includes a detailed review of the grading of the roadways, back of
<br />sidewalks, and driveways to ensure that no drainage issues result after construction. Ms. Gillette serves as Project Manager.
<br />c
<br />
<br />(1) TITLE AND LOCATION (City and State)
<br /> Lift Stations 101, 202, 404, 610
<br /> Boynton Beach, FL
<br />
<br />(2) YEAR COMPLETED
<br />
<br />PROFESSIONAL SERVICES
<br />2010
<br />CONSTRUCTION (If Applicable)
<br />2010
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X ] Check if project performed with current firm
<br />Erdman Anthony was responsible for the survey, design, permitting, preparation of construction plans, construction observation, and
<br />certification for the replacement of sanitary sewer pumping stations. The pump station replacement projects involved tight right of
<br />way constraints, unstable soil conditions, value engineering, and provisions for maintenance of service during construction. All pump
<br />stations were submersible centrifugal pumps in concrete wet wells. Mr. Ziemianski served as Principal in Charge.
<br />d
<br />
<br />(1) TITLE AND LOCATION (City and State)
<br /> Everglades Island Water Valve Replacement
<br /> West Palm Beach, FL
<br />
<br />(2) YEAR COMPLETED
<br />
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (If Applicable)
<br />2015
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Erdman Anthony was responsible for the survey, design, and construction observation for water valve replacement project. The
<br />work, which involved replacing valves ranging in size from 8” to 16”, was within a tight 30’ wide right of way at the T intersection that
<br />serves as the only access point to all of the residents on Everglades Island. This required special attention to the maintena nce of
<br />traffic. Mr. Ziemianski served as Principal in Charge.
<br />e
<br />
<br />(1) TITLE AND LOCATION (City and State)
<br />Woolbright Road Raw Water Main
<br />Boynton Beach, FL
<br />
<br />(2) YEAR COMPLETED
<br />
<br />PROFESSIONAL SERVICES
<br />2015
<br />
<br />CONSTRUCTION (If Applicable)
<br />2015
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Erdman Anthony designed a two-mile section of 36-inch raw water main for the City of Boynton Beach from Military Trail to Congress
<br />Avenue. Factors such as utility impacts, safety, maintenance of traffic, impacts to the community, permitting, construction c osts, and
<br />operational costs were considered. The Woolbright Road route includes a section with a bridge over Quail Covey Road. Mr.
<br />Ziemianski served as Principal in Charge.
<br />
|