My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Erdman Anthony of Florida, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Erdman Anthony of Florida, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 4:43:48 PM
Creation date
9/4/2018 4:38:39 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br /> <br />12. NAME <br />Scott Edgar, PE <br /> <br />13. ROLE IN THIS CONTRACT <br />Highway Engineer <br />14. YEARS EXPERIENCE <br /> a. TOTAL <br />21 <br /> b. WITH CURRENT <br />FIRM <br /><1 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Erdman Anthony of Florida, Inc., West Palm Beach, FL <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />BS/Civil Engineering <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (DEGREE AND <br />SPECIALIZATION) <br />FL/ Professional Engineer <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Scott Edgar has over 21 years of design and management experience in transportation engineering, which includes urban <br />and rural highway design. He has been responsible for preliminary and final design elements for reconstruction, resurfacing, <br />restoration, and rehabilitation projects of existing highways and interchanges. <br />19. RELEVANT PROJECTS <br />a <br /> <br />(1) TITLE AND LOCATION (City and State) <br />Palmetto Park Road <br />Royal Palm Beach, Florida <br /> <br />(2) YEAR COMPLETED <br /> <br />PROFESSIONAL SERVICES <br />2017 - Ongoing <br /> <br />CONSTRUCTION (If <br />Applicable) <br /> <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager. Project improvements consist of adding eastbound and westbound auxiliary lanes along the existing <br />approximate 0.5-mile-long 6-lane Palmetto Park Road project segment between Military Trail and the CSX Railroad west <br />of I-95. Improvements will also include the design of a northbound to eastbound “hot right” turn allowing the free flow <br />movement with associated traffic signal adjustments. <br />b <br /> <br />(1) TITLE AND LOCATION (City and State) <br />El Mar Drive <br />Lauderdale-By-The-Sea, Broward County <br /> <br />(2) YEAR COMPLETED <br /> <br />PROFESSIONAL SERVICES <br />2017 - Ongoing <br /> <br />CONSTRUCTION (If <br />Applicable) <br /> <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager. The project includes construction of a shared-use path through a median and milling and resurfacing El <br />Mar Drive. The project scope for North Ocean Drive includes striping the bike lane from Flamingo Avenue to Palm Avenue, <br />ADA improvements, and incidental drainage work. The total length of construction is approximately 6,000 linear feet. <br />c <br /> <br />(1) TITLE AND LOCATION (City and State) <br />Spruce Avenue <br />West Palm Beach, FL <br /> <br />(2) YEAR COMPLETED <br /> <br />PROFESSIONAL SERVICES <br />2016 - Ongoing <br />CONSTRUCTION (If <br />Applicable) <br /> <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager. The City of West Palm Beach will improve Spruce Ave. from 25th Street to 40th Street (0.9 miles) to <br />redesign the traffic circles along the corridor, mill and resurface the roadway and provide drainage and curb adjustments. <br />d <br /> <br />(1) TITLE AND LOCATION (City and State) <br />FDOT District 4, SR 806/Atlantic Ave Reconstruction Project from <br />West of SR 7 to East of Lyons Road <br />Palm Beach County, FL <br /> <br />(2) YEAR COMPLETED <br /> <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If <br />Applicable) <br /> <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />Project Manager. This project consists of reconstructing and widening of Atlantic Ave from a 2-lane rural arterial to a 4- <br />lane divided suburban roadway with provisions for 6 lanes in the future. The project includes the relocation of the LWDD L- <br />34 canal, right of way acquisition, minor bridge upgrades, signalization, lighting, utility coordination, public involvement, <br />and signing and pavement markings. <br />e <br /> <br />(1) TITLE AND LOCATION (City and State) <br />FDOT District 4, SR 9/I-95 at Linton Blvd Interchange Project <br />Palm Beach County, FL <br /> <br />(2) YEAR COMPLETED <br /> <br />PROFESSIONAL SERVICES <br />2014 <br /> <br />CONSTRUCTION (If <br />Applicable) <br /> <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />Project Manager. This project involves the realignment and widening of the interchange ramps and the widening of CR- <br />782/Linton Blvd from west of Congress Ave to SW 10th Street to meet the projected traffic levels in 2040. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.