E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br />12. NAME
<br />Kevin Barnes, PE,
<br /> LEED® AP
<br />13. ROLE IN THIS CONTRACT
<br />Project Engineer
<br />14. YEARS OF SERVICE
<br />a. TOTAL
<br />25
<br />b. WITH CURRENT FIRM
<br />11
<br />15. FIRM NAME AND LOCATION (City and State)
<br />16. EDUCATION (Degree and Specialization)
<br />BS, Civil Engineering, Virginia Military Institute
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />Licensed Professional Engineer – SC, NC, AR, MO, VA, GA
<br />LEED® AP
<br />NCEES Record Certification
<br />ISI Envision Sustainability Professional (ENV-SP)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Utility Conversion, Ocean Boulevard North (29th Avenue to 34th Avenue),
<br />City of North Boulevard, North Myrtle Beach, South Carolina
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />n/a
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project was performed with current firm
<br />Kevin serves as the project manager for this overhead electric and communication line utility conversion project which will also
<br />relocate and upgrade the existing water services within the project area. Once completed, our design will install new conduit
<br />and associated structures, equipment pads, pedestals and new decorative street lighting along the project corridor. We are
<br />placing the main conduit trench within the center turn lane to reduce traffic control requirements and disruption to drivers. This
<br />project connects to the previously completed utility conversion project from Sea Mountain Highway to 29th Avenue North.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Utility Conversion, Ocean Boulevard North (Sea Mountain Highway to 29th
<br />Avenue North), City of North Myrtle Beach, North Myrtle Beach, SC
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If applicable)
<br />2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project was performed with current firm
<br />Kevin served as project manager for this utility conversion project. This conversion consisted of relocating overhead electric
<br />and communication lines to an underground conduit system along North Ocean Boulevard from Sea Mountain Highway to
<br />29th Avenue North. This project was a joint effort in conjunction with the City of North Myrtle Beach, Santee Cooper Electric
<br />Cooperative, Horry Telephone Cooperative, Time Warner Cable and Frontier Communications. The project also involved the
<br />relocation and upgrade of the existing water service within the project area. This project is furthering the goal of removing and
<br />relocating overhead utility lines and improving the overall aesthetics of the Ocean Boulevard corridor.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Utility Conversion and Intersection Improvements, US 17 and 6th Avenue
<br />South, City of North Myrtle Beach, North Myrtle Beach, South Carolina
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2011
<br />CONSTRUCTION (If applicable)
<br />2012
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project was performed with current firm
<br />Kevin was the project manager for the engineering design and construction engineering services required for intersection
<br />improvements and utility conversion at 6th Avenue South and US 17 in the City of North Myrtle Beach. The utility conversion
<br />consisted of relocating overhead electric and telecommunication lines to an underground conduit system. This was a joint effort
<br />in conjunction with local utility providers. The intersection improvements were federally-funded and managed through a Local
<br />Participation Agreement between SCDOT and the City of North Myrtle Beach. Improvements consisted of the addition of turn
<br />lanes along 6th Avenue South, signalization upgrades, drainage and streetscape improvements. As the project manager, Kevin’s
<br />responsibilities included overseeing survey, drainage and utility design, environmental documentation and permitting, landscape
<br />architecture and construction engineering.
<br />333 Wellness Drive
<br />Myrtle Beach, South Carolina 29579
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
|