|
STANDARD FORM 330
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE
<br />Paul Weinberg, PLA, ASLA Senior Landscape Architect a. TOTAL b. WITH CURRENT FIRM
<br />18 1
<br />15. FIRM NAME AND LOCATION (City and State)
<br />KEITH,Pompano Beach, Florida
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />B.S. Landscape Architecture, Michigan State University, 2000 State of Florida Professional Landscape Architect License No.
<br />6666804
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Council of Landscape Architecture Registration Boards (CLARB Certified); American Society of Landscape Architects (ASLA), Member;
<br />Urban Land Institute, Member; American Resort Development Association (ARDA), Member;
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Las Olas Boulevard Corridor Study (Fort Lauderdale, Florida)PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />On-going N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Weinberg was responsible for managing a concept study for the Las Olas Corridor, reviewing lane configurations,pedestrian mobility
<br />and overall beautification improvements along this stretch of Fort Lauderdale.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Parkland Roundabout Conceptual Design (Parkland, Florida)PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2018 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm
<br />The KEITH Team developed a branding package for the City of Parkland with a signature element intended of being a large roundabout
<br />feature. The City requested a water feature and KEITH took the opportunity to develop the idea of understated country elegance to guide
<br />the vision for Parkland. The result of the initial study was the concept of combing the city’s rich equestrian history with the old oak
<br />hammocks. The design aims to create a memorable statement at this key location in the city that will be easily recognizable as “Parkland”.
<br />The intent is to develop additional elements to fit within the City ROW that will continue to further develop the image and brand initiated
<br />with this effort.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Pompano Beach East CRA District Projects (Pompano Beach, Florida)PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2016 2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm
<br />KEITH provided planning, civil engineering, surveying, SUE and landscape architecture services for the CRA, which had ambitious plans
<br />for the redevelopment of the area south of the pier from Atlantic Boulevard to NE 5th Street to create a unique beachfront venue. These
<br />projects include the Pompano Beach Boulevard Streetscape Improvements including the Beach Plaza, Pompano Beach Park Dune
<br />Restoration and the completion of the new Pier Parking Garage, an iconic structure designed to herald in a wave of redevelopment and
<br />enhanced access to the Beach area. The purpose of these projects is to revitalize and create an oceanfront pedestrian promenade, both
<br />vibrant and uniquely branded for local residents and visitors of Pompano Beach.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Lake Worth Beach Complex (Lake Worth, Florida)PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />On-going N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Weinberg is leading the landscape architecture and planning design effort for the renovation of the city’s beach complex. He is a key
<br />member of the overall design team responsible for developing conceptual designs that incorporate various aspects of the existing facility.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Atlantic Boulevard Streetscape Improvements (Margate, Florida)PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />On-going N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm
<br />The CRA requested the KEITH Team develop a branded approach to several of the city’s ROW and streetscapes. The request includes
<br />multiple miles of streetscape, medians, walls, walkways, landscape, lighting, signage and a signature fountain feature. The team worked
<br />to create a brand or identity that can be utilized throughout the City in these public realm areas. The signature element for this streetscape
<br />initiative is the addition of a roundabout and fountain feature. The CRA requested that a theme of a child fishing along the edge of the
<br />canal be utilized for inspiration. KEITH had to work around existing infrastructure items and yet was able to develop a creative approach
<br />for the fountain. The result was a combination of water, sculpture, landscape and hardscape to make a statement for the City and CRA of
<br />Margate.
<br />f.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Fort Lauderdale Beach CRA Streetscape Master Plan (Fort Lauderdale,
<br />Florida)
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2008 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Weinberg led a team of designers to develop complete street guidelines for the Beach CRA district including site furniture, pedestrian
<br />walkways,transit stops, water taxi stops, signage and roadway cross sections.
|