Laserfiche WebLink
STANDARD FORM 330 <br /> <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Hugo Soto, P.E. <br /> Principal Engineer a. TOTAL b. WITH CURRENT FIRM <br />37 6 <br />15. FIRM NAME AND LOCATION (City and State) <br />Terracon Consultants, Inc. Miami Lakes, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />B.S./Civil Engineering M.S./ Geotechnical <br />Engineering <br />Florida/Professional Engineer <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Affiliations: American Society of Civil Engineers Cuban Society of Engineers <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />SL-3A.1-SP-1 Transmission Force Main Phase 1/ SL-3B.1-SP-1 South <br />Suction Force Main, Ocean Outfall Legislation Program (OOL) <br />Miami-Dade County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2018 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> Check if project performed with current firm Principal Engineer. A transmission force main is planned to be installed from PS 1 (SW 136th Street, West of SW 137th Avenue) to <br />approximately the intersection of SW 152 nd Street and SW 137th Avenue. The 60-inch force main will be installed using trenchless <br />construction methods under SW 152nd Street, under the CSX railroad, and under SW 136th Street. Terracon provided geotechnical <br />exploration, laboratory testing, and geotechnical engineering recommendations to assist in the design and construction of the <br />proposed project. Firm’s Fee: $99,577 <br />b. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />SL-3B.1-SP-1 North Suction Force Main, OOL <br />Miami-Dade County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2018 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> Check if project performed with current firm Principal Engineer. Geotechnical exploration was performed for the proposed transmission force main to be installed along SW 137th <br />Avenue between SW 104th Street and SW 136th Street in Miami-Dade County, Florida. The firm’s scope of work consisted of <br />performing soil borings to a depth of 50 feet below the existing ground surface and to a depth of 30 feet below the existing ground <br />surface. Terracon also provided the results of the subsurface exploration, laboratory testing, engineering and construction <br />considerations, and geotechnical engineering recommendations to assist in the design and construction of the proposed project. <br />Firm’s Fee: $54,663 <br />c. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />48-inch Diameter Water Main Downtown Loop Closure <br />Miami, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2018 N/A <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> Check if project performed with current firm Principal Engineer. The 48-inch diameter water main will be constructed under railroad tracks and roadway at the Miami Loop, <br />along NW 12th Street between NW 1st Avenue West and NW 1st Avenue East. Terracon provide geotechnical exploration services <br />including drilling borings. The purpose of these services was to provide subsurface field exploration, laboratory testing information, <br />and geotechnical engineering recommendations to assist in the design and construction of the water main. Firm’s Fee: $11,987 <br />d. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />10-inch Diameter (D.I.) Force Main <br />Miami-Dade County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2017 N/A <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> Check if project performed with current firm The project site was being studied for the installation of a 10 -inch D.I. force main. The project corridor runs along Douglas Drive <br />from Madison Avenue to Pump Station No. 743 (SW 110th Avenue) in Miami-Dade County, Florida. Terracon performed <br />geotechnical exploration for the proposed project. Standard Penetration Test (SPT) borings were drilled to depths of 15 feet below <br />the existing ground surface. Geotechnical considerations that were identified included subsurface soil and rock conditions, <br />groundwater conditions, foundation design and construction, and earthwork. The purpose of the subsurface field exploration was <br />to furnish laboratory testing information and to provide geotechnical engineering recommendations concerning earthwork to assist <br />in the design and construction of the new 10-inch D.I. force main. Firm’s Fee: $14,545 <br />