My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Erdman Anthony of Florida, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Erdman Anthony of Florida, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 4:43:48 PM
Creation date
9/4/2018 4:38:39 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete One Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br /> <br />7 <br />21. TITLE AND LOCATION (City and State) <br />Palmetto Park Road <br />Royal Palm Beach, FL <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 - Ongoing <br />CONSTRUCTION (if applicable) <br /> <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />Palm Beach County Roadway Production <br />b. POINT OF CONTACT NAME <br />Antolina Michel-Diaz, PE <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />561-684-4000 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost) <br /> <br />The existing east-west Palmetto Park Road project segment is a six-lane divided urban major arterial roadway, within a <br />200 ft. right of way (R/W). The roadway has a posted speed limit of 40 mph eastbound and 45 mph westbound. Project <br />improvements consist of adding eastbound and westbound auxiliary lanes and 7-foot buffered bike lanes along the <br />existing 0.5-mile-long project segment between Military Trail and the CSX Railroad west of I-95. Improvements will also <br />include the design of a northbound to eastbound “hot right” turn allowing the free flow movement with associated <br />traffic signal adjustments. Other tasks include permitting, drainage, light pole relocations and utility coordination <br />assistance. <br /> <br />Optional Services include Post Design Services, Environmental Permitting (based on presence of protected species) and <br />Retaining Wall design. Services may include, but will not be limited to, meetings, construction assistance, plans <br />revisions, shop drawing review and survey services. <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> <br />a <br />(1) FIRM NAME Erdman Anthony of Florida, Inc. <br />(2) FIRM LOCATION (City and State) <br />West Palm Beach, FL <br />(3) ROLE <br />Prime <br />
The URL can be used to link to this page
Your browser does not support the video tag.