Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE <br />PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />21. TITLE AND LOCATION (City and State) <br />Utility Conversion, Ridgewood Avenue (US 1), <br />South Daytona, Florida <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2011 <br />CONSTRUCTION (If applicable) <br />2013 <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />City of South Daytona <br />b POINT OF CONTACT NAME <br />Les Gillis <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />386-322-3080 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost) <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a.(1) FIRM NAME <br />QLH, A Mead & Hunt Company <br />(2) FIRM LOCATION <br />Port Orange, Florida <br />(3) ROLE <br />Design, utility coordination and relocation, ADA <br />compliance <br />b.(1) FIRM NAME (2) FIRM LOCATION (3) ROLE <br />This project installed approximately 94,000 linear feet of conduit <br />to convert existing aerial utilities along Ridgewood Avenue <br />(US 1) between Beville Road and Big Tree Road. The design also <br />included installing approximately 4,300 linear feet of 10-, 6- and <br />4-inch reclaimed water mains and various appurtenances for the <br />conduit and reclaimed water main. <br />The utility conversion portion of this project consisted of con- <br />verting approximately 40 overhead utility services to new <br />underground facilities. Our design also installed a roadway <br />median lighting system for accent and up-lighting of the <br />existing landscaping. <br />Streetscape improvements included widening the exist- <br />ing sidewalks from five feet to six feet and adding decorative <br />features. We also removed on-street parking, added a bicycle <br />lane, replaced curbing, improved ADA accessibility, created a <br />utility/green space behind the sidewalk for landscaping pur- <br />poses, improved traffic signals and resurfaced and restriped <br />the roadway. This project was performed as Quentin L. Hampton <br />Assoc. Inc. which merged with Mead & Hunt in 2017. <br />Construction cost: $4.5 million; Fees: $453,000 <br />STANDARD FORM 330 (REV. 8/2016) PAGE 8 <br />Conduit Sizes and Lengths <br /> ƒ1.5-inch: 14,700 feet <br /> ƒ2-inch: 43,020 feet <br /> ƒ3-inch: 680 feet <br /> ƒ4-inch: 28,900 feet <br /> ƒ6-inch: 10,200 feet <br />Joint Effort Partners <br /> ƒCity of South Daytona <br /> ƒFPL <br /> ƒBellsouth <br /> ƒBrighthouse Networks