My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Erdman Anthony of Florida, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Erdman Anthony of Florida, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 4:43:48 PM
Creation date
9/4/2018 4:38:39 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE <br />PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />21. TITLE AND LOCATION (City and State) <br />Utility Conversion, US 1 Utility Undergrounding, <br />Holly Hill, Florida <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br />Ongoing <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />City of Holly Hill <br />b POINT OF CONTACT NAME <br />Walt Smyser <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />386-248-9463 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost) <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a.(1) FIRM NAME <br />Mead & Hunt <br />(2) FIRM LOCATION <br />Port Orange, Florida <br />(3) ROLE <br />Design, utility coordination and conversion, permit- <br />ting, bidding assistance, construction administra- <br />tion, inspections <br />b.(1) FIRM NAME (2) FIRM LOCATION (3) ROLE <br />Mead & Hunt is providing design, permitting and bidding assis- <br />tance in addition to construction contract administration and <br />inspections on this 1.7-mile utility conversion project along US 1. <br />The first phase of this project included the design, permitting and <br />construction of individual electrical and communication services <br />to each of the properties fronting US 1. The design also upgraded <br />FPL streetlighting to current Florida Department of Transportation <br />(FDOT) requirements and installed additional underground <br />conduit for the City’s future communication expansion. <br />The second phase requires individual building permits for the <br />properties. We are coordinating with various communication pro- <br />viders to review the designs of their underground facilities. <br />After this step, our team collaborated to design a master set <br />of construction documents that incorporated the necessary <br />conduits for each provider’s facilities. Permitting included FDOT <br />Utility permits, building permits for the electrical service conver- <br />sions, and St. Johns River Water Management District and US <br />Army Corps of Engineers Environmental Resource Permitting for <br />the LPGA Canal crossing. <br />Construction cost: $2.9 million; Fees: $138,600 <br />STANDARD FORM 330 (REV. 8/2016) PAGE 7 <br />Conduit Sizes and Lengths <br /> 2-inch: 75,680 feet <br /> 6-inch: 13,000 feet <br />Joint Effort Partners <br /> City of Holly Hill <br /> FPL <br /> AT&T <br /> Level 3 <br /> Spectrum <br /> FDOT <br /> Volusia County
The URL can be used to link to this page
Your browser does not support the video tag.