My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Erdman Anthony of Florida, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Erdman Anthony of Florida, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 4:43:48 PM
Creation date
9/4/2018 4:38:39 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Erdman Anthony’s success is based on strong project management that has been driven by continued corporate growth. <br />Coordination between Erdman Anthony and the City will be maintained through an effective consultant -client <br />communication policy. Erdman Anthony’s Project Manager, Dana I. Gillette, PE, will develop administrative procedures <br />such as the organization of the project, its implementation, and the management of the work progress. She will be <br />available to the City throughout the course of the contract. The project manager will initiate all communication between <br />our team and the City. Ms. Gillette will also facilitate further between members of the team through continuous direct <br />access to key staff. <br /> <br />We are very excited about the opportunity to work with the City and would not pursue this contract if we did not have <br />adequate availability and resources to perform the work to our own high expectations. Erdman Anthony has proven our <br />ability to deliver challenging projects in a timely and quality manner. Our West Palm Beach office offers the project <br />management experience needed to lead our Team’s services, and a staff of experienced engineers and construction <br />inspection personnel that has successfully completed similar professional services for local municipalities and state <br />agencies. <br /> <br />The proposed staff of the Erdman Anthony/Mead & Hunt Team currently have availability. We are committed to providing <br />the necessary human and equipment resources to complete this project for Sunny Isles Beach in accordance with the <br />schedule we develop with City staff. We are sensitive to our clients’ schedules and would not be pursuing this contract if <br />we were not capable of and committed to completing it. We project staff utilization, based on actual backlog of current <br />contracts, in advance and we are certain that the staff is competent and available for this contract. <br /> <br />We have thought through our approach to assigning staff to complete this contract on schedule. We anticipate the <br />following lead staff responsible for core components of this contract: <br /> <br />ROLE PROFESSIONAL FIRM <br />Project Manager Dana Gillette, PE, PSM Erdman Anthony <br />Quality Control Manager Dan Ziemianski, PE Erdman Anthony <br />Easement Documents City Attorney <br />Geotech Hugo Soto, PE Terracon <br />Survey Bryan Merritt, PSM Erdman Anthony <br />Base Maps Allen Kull Mead & Hunt <br />Electrical Engineering P. Anthony Hanson, PE Patterson & Dewar Engineers <br />Utility Locates/Coordination Daniel Checchi KEITH <br />Conduit Design Plans David King, PE Mead & Hunt <br />Stormwater Design Kevin Barnes, PE Mead & Hunt <br />Highway Engineering Scott Edgar, PE Erdman Anthony <br />Lighting Nisar Khan, PE, PhD Erdman Anthony <br />Landscape Architecture Paul Weinberg, PLA, ASLA KEITH <br />Public Outreach City of Sunny Isles Beach <br />Permits Phoebe Cuevas-Molina, PE, LEED AP BD +C Erdman Anthony <br />Bidding and Const. Mgt. Susan Dalton, PE Erdman Anthony <br />Construction Inspection Dane Dussie Erdman Anthony <br /> <br />Over the last seven years, Erdman Anthony has successfully completed many projects exceeding $200 million in contract <br />value, approximately $18M of which were performed in our West Palm Beach office. Our success is exemplified by the <br />fact that 95% of our work is completed for repeat clients. Client references are included in Section J of this proposal. <br />Examples of projects similar to those stated in the scope of work are included in this SF330. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.