<br /> <br />Underground Cable Replacement <br />Marietta, GA <br /> <br />In 2010, Lockheed Martin Corporation consulted with P&D regarding its old Paper Insulated Lead Cable <br />(PILC) system in Marietta, Georgia, and determined that it needed to be replaced. Many of the cables <br />dated back to the 1950’s, and because they were encased in lead, not only did they pose an <br />environmental/health hazard, there were very few people available who were qualified to repair them. <br />Repair had become a significant issue since the cables had begun to fail frequently due to age. <br /> <br />Working with the Lockheed facilities staff, P&D developed a program to replace the cables in this 12 kV <br />system across seven project phases over the next several years (2011 to 2016). This project required <br />extensive coordination to keep the system operational while replacing approximately 30 miles of cable <br />with more than 50-unit substation loads (12 kV to 480 V). Since nearly all unit substations have two <br />different feeders serving them, switching could be performed during low activity hours to minimize <br />impact on plant production. <br /> <br />P&D provided detailed design for this project that included researching and updating systems maps, <br />many of which had not been updated in 20 years. To do this update, we performed a manhole survey to <br />determine exactly which conduits were used by what circuits. We were then able to detail the exact <br />conduit-cable routing and replacement and provide a comprehensive map of this complex cable system <br />to the client. P&D has remained a trusted advisor to Lockheed for more than 30 years; we continue to <br />be the first call Lockheed makes whenever special problems occur within its power distribution systems. <br /> <br />Underground Distribution <br />Brewton, AL <br /> <br />For Southern Pine EC, P&D designed 0.75 miles of underground distribution circuit to supply service to <br />Wind Creek Casino located Atmore, AL. We prepared a labor and material contract with comprehensive <br />construction specifications for the triple circuit 600A system. The conductor used 500 MCM cable. We <br />performed field investigations and developed detailed plan drawings. We prepared a labor and material <br />contract with comprehensive construction specifications. P&D solicited bids for the contract, answered <br />contractor questions during bidding, conducted the bid opening, and evaluated the proposals received <br />for conformance to the technical requirements of the contract. P&D also oversaw installation of a new <br />automated switchgear to serve the new load. <br /> <br />Subdivision Underground Distribution <br />Multiple Locations, FL <br /> <br />This group of projects in 6 counties throughout the Florida panhandle consisted of design for <br />underground distribution circuits and street lighting in 20 subdivisions. Project sites ranged from 25 to <br />2500 lots per subdivision. Once the construction contractor laid out the general arrangement of each <br />subdivision, blueprints were turned over to P&D. These blueprints were scaled drawings that showed <br />streets, lot lines, routing of water and sewer lines, etc. P&D designed the backbone of power grid for <br />each subdivision and added it to the blueprints. Futura software was used to complete the design. <br /> <br />Once excavation and curbing were completed, P&D went onsite to field stake duct bank route selections <br />and location of proposed equipment. Equipment included junction boxes, handholes, terminations