CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
<br />UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL
<br />
<br />Neighborhood Infrastructure Improvements, Roadway Improvements, Stormwater /
<br />Drainage Improvements / Water/ Reuse Water / Sanitary Improvements
<br />CTA has designed numerous projects which have included water distribution and
<br />transmission systems, water services, fire hydrants, deep sewer systems, complex multiple
<br />pumping stations, storm drainage, and roadway/right-of-way restoration for neighborhood
<br />revitalization projects. Designs have included neighborhood improvements, roadways,
<br />sidewalks, ADA improvements, water distribution systems, pumping stations, sanitary lift
<br />stations, sanitary collection systems, force main, water quality BMPs, storm drainage,
<br />stormwater quality improvements, and stormwater management.
<br />We have extensive experience, knowledge and insight in the public outreach, design,
<br />permitting, bidding and construction services of major infrastructure projects. Our
<br />experience includes hundreds of miles of pipe installation for public entities.
<br />Neighborhood Infrastructure Improvements
<br />CTA has acted as the prime consultant on all of our neighborhood improvement projects.
<br />Many of our large neighborhood projects have included extensive lengths of roadway and
<br />right-of-way reconstruction.
<br />▪ The North County Neighborhood Improvement Project, NE Quadrant, Bid Package 9
<br />The North County Neighborhood Improvement Project
<br />(NCNIP) Northeast Quadrant, Bid Package 9 included
<br />approximately 152 acres of land between Dixie
<br />Highway and Federal Highway, north of Sample Road.
<br />Designed improvements included 38,863 linear feet
<br />of roadway, 23,000 linear feet of sidewalk, and
<br />14,000 linear feet of swale, 6,560 linear feet of storm
<br />sewer, 8,920 linear feet of exfiltration trench and two
<br />(2) stormwater control structures, a reuse water
<br />distribution system consisting of 22,000 linear feet of
<br />4” diameter, and 1,800 linear feet of 12” diameter
<br />main, 57,000 linear feet of domestic water main and
<br />40,000 linear feet of sanitary sewer collection and
<br />transmission systems. CTA provided topographic
<br />survey, design, permitting landscape architecture, and
<br />construction engineering and inspection services. The
<br />project was completed in 2012.