Laserfiche WebLink
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES <br />UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL <br /> <br />Neighborhood Infrastructure Improvements, Roadway Improvements, Stormwater / <br />Drainage Improvements / Water/ Reuse Water / Sanitary Improvements <br />CTA has designed numerous projects which have included water distribution and <br />transmission systems, water services, fire hydrants, deep sewer systems, complex multiple <br />pumping stations, storm drainage, and roadway/right-of-way restoration for neighborhood <br />revitalization projects. Designs have included neighborhood improvements, roadways, <br />sidewalks, ADA improvements, water distribution systems, pumping stations, sanitary lift <br />stations, sanitary collection systems, force main, water quality BMPs, storm drainage, <br />stormwater quality improvements, and stormwater management. <br />We have extensive experience, knowledge and insight in the public outreach, design, <br />permitting, bidding and construction services of major infrastructure projects. Our <br />experience includes hundreds of miles of pipe installation for public entities. <br />Neighborhood Infrastructure Improvements <br />CTA has acted as the prime consultant on all of our neighborhood improvement projects. <br />Many of our large neighborhood projects have included extensive lengths of roadway and <br />right-of-way reconstruction. <br />▪ The North County Neighborhood Improvement Project, NE Quadrant, Bid Package 9 <br />The North County Neighborhood Improvement Project <br />(NCNIP) Northeast Quadrant, Bid Package 9 included <br />approximately 152 acres of land between Dixie <br />Highway and Federal Highway, north of Sample Road. <br />Designed improvements included 38,863 linear feet <br />of roadway, 23,000 linear feet of sidewalk, and <br />14,000 linear feet of swale, 6,560 linear feet of storm <br />sewer, 8,920 linear feet of exfiltration trench and two <br />(2) stormwater control structures, a reuse water <br />distribution system consisting of 22,000 linear feet of <br />4” diameter, and 1,800 linear feet of 12” diameter <br />main, 57,000 linear feet of domestic water main and <br />40,000 linear feet of sanitary sewer collection and <br />transmission systems. CTA provided topographic <br />survey, design, permitting landscape architecture, and <br />construction engineering and inspection services. The <br />project was completed in 2012. <br /> <br /> <br />E | Page 2