Laserfiche WebLink
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES <br />UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL <br /> <br />▪ The North County Neighborhood Improvement Projects, NE Quadrant Bid, Package 10. <br />The North County Neighborhood Improvement Project (NCNIP) Northeast Quadrant, Bid <br />Package 10 included approximately 213 acres of land. The project included 47,520 <br />linear feet of roadway reconstruction, and 53,460 linear feet of sidewalk construction. <br />Also included were 15,283 linear feet of swale, 6,508 linear feet of storm sewer, and <br />8,074 linear feet of exfiltration trench. Several <br />traffic calming devices were designed and <br />constructed as part of this Project. A reuse <br />water distribution system consisting of 32,900 <br />linear feet was constructed on Bid Package 10, <br />as well as approximately 4,740 linear feet of <br />water main, 21 water services, 27,755 linear <br />feet of sanitary sewer collection and <br />transmission lines, and 475 laterals. CTA <br />provided topographic survey, design, permitting <br />landscape architecture, and construction <br />engineering and inspection services. The <br />project was completed in 2013. <br />▪ The North County Neighborhood Improvement Projects, NE Quadrant Bid, Package 11. <br />The North County Neighborhood Improvement Project (NCNIP) Northeast Quadrant, Bid <br />Package 11 included approximately 357 acres of land between Dixie Highway and <br />Federal Highway, north of Sample Road in Broward County. The project included over <br />50,688 linear feet of new roadway construction, sidewalks, driveway aprons, and sodded <br />swales In addition the project included over 14,777 linear feet of new storm sewer, <br />12,993 linear feet of exfiltration trench, 64,000 linear feet of water main, 553 Water <br />Services (many of these services were moved from the rear of the lot to the front), <br />49,700 linear feet of reuse water main, 796 reclaimed water services, 43,805 linear <br />feet of gravity sewer main, 750 sewer laterals, lift station, and 1,630 linear feet of force <br />main. CTA provided surveying, civil engineering, landscape architecture and CEI services <br />on the project. The project was completed in 2014. <br />▪ The North County Neighborhood Improvement Projects, NW Quadrant. <br />The North County Neighborhood Improvement Project (NCNIP) NW Quadrant is a project <br />which includes approximately 650 acres of land between Dixie Highway and I-95, North <br />of Sample Road, Roadway improvements included 115,596 linear feet of roadway, along <br />with 104,637 linear feet of sidewalk, and storm sewer included 17,006 linear feet of <br />pipe, and there were 33,191 linear feet of exfiltration trench. Additionally, the sanitary <br />sewer collection system consisted of 70,783 linear feet of gravity main, 14,253 linear <br />feet of force main, and four (4) lift stations. The water distribution system additions <br />included 86,112 linear feet of watermain and 1,590 water services CTA provided <br />topographic survey, design, permitting landscape architecture, and construction <br />engineering and inspection services. The project was completed in 2012. <br /> <br />E | Page 3