|
<br /> STANDARD FORM 330
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Douglas R. Taylor, P.E.
<br />13. ROLE IN THIS CONTRACT
<br />Civil Engineer
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />34
<br />b. WITH CURRENT FIRM
<br />7
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />University of Illinois (UIUC)
<br />Bachelor of Civil Engineering (1984)
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Professional Engineer - Florida No. 50569 (1996)
<br />Professional Engineer - IL No. 44542 (1988)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />-FEMA ICS 100,200,700,800 - FEMA G300, G400) -Florida Green Building Council -Florida Redevelopment Association APWA
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />LW 2020 Mater Plan Year 1 Improvements
<br />Lake Worth, Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2013 - 2014 In Progress
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Director. Project includes design and permitting. Year 1 of the Lake Worth 2020 Master Plan. The
<br />project includes the rehabilitation of right-of-way infrastructure including roads, alleys, curb, sidewalk, hardscape,
<br />drainage, and potable water. The project includes over 13,000 linear feet of roadway and storm sewer along
<br />with in excess of 6,000 linear feet of watermain.
<br />b.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Miami Gardens Livable Neighborhood Improvement Project,
<br />Miami Gardens, Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2009 - Present 2010 - Present
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />The Livable Neighborhoods Improvement Project includes approximately 222 total acres of land . The project
<br />includes: 34,200 linear feet of roadway, 7,840 linear f eet of sidewalk, 19,000 linear feet of storm sewer, 151
<br />drainage structures, the regrading of 22,500 linear feet of swales, and the addition of 112 street lights, along
<br />with street trees and landscape/hardscape.
<br />c.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Eastside Infrastructure Improvements, Phases 2 & 3
<br />Town of Davie, Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2015 2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Civil Engineer for 18,940 linear feet of storm sewer, the reconstruction of 5.2 miles of roadway. 14,800 linear
<br />feet of 6" diameter main, 5,075 linear feet of 8" diameter main, and 5,,140 linear feet of 12" diamete r main,
<br />455 linear feet of 8" diameter sanitary sewer, 40 sanitary manholes and 2,945 linear feet of 16" diameter
<br />forcemain.
<br />d.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Miami Springs City-Wide ADA Ramps
<br />Miami Springs, Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2015 2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Taylor assisted with the design and permitting of new and replacement ADA ramps throughout the City. The
<br />project is funded through the legislative appropriation process. The project includes field evaluation of
<br />intersections throughout the City to determine the location of non-conforming or missing ADA ramps. CTA
<br />developed a set of construction plans for installation of the ramps per FDOT standards.
<br />e.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Traffic Calming at the Intersections of 123rd Street & NW 1st
<br />Court, 123rd Street & Miami Court, NW 139th Terrace & NW
<br />5th Court, North Miami
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2015 2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Lead Engineer - The project involved the development of designs for traffic calming features along NW 123th
<br />Street and NW 1st Court, NW 123rd Street and NW Miami Court, and 139th Street NW 5th Court in the City of North
<br />Miami. These intersections had large expanses of pavement without traffic control and therefore required the
<br />implementation of traffic calming features. CTA design elevated intersections, removed pavement and
<br />introduced curbing to reduce speeds.
<br />
<br />E | Page 19
|