Laserfiche WebLink
<br /> STANDARD FORM 330 <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Joseph D. Handley, R.L.A. <br />13. ROLE IN THIS CONTRACT <br />Lead Landscape Architect <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />35 <br />b. WITH CURRENT FIRM <br />30 <br />15. FIRM NAME AND LOCATION (City and State) <br />Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Clemson University, B.S. in Ornamental Horticulture <br />(1980); University of Georgia & Louisiana St. University, <br />Master in Landscape Architecture Studies (1984) <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Registered Landscape Architect <br />Florida Registration No. 1368 (1990) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />- American Society of Landscape Architects - CPTED Certification (August 1999) <br /> <br /> <br />19. RELEVANT PROJECTS <br /> <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Bicycle/Pedestrian Greenway & Trails Master Plan <br />Sunrise, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2014 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mr. Handley was the CTA Principal-in-Charge for the preparation of the Bicycle / Pedestrian Greenways & Trails <br />Master Plan. The Plan defines a system of sidewalks, bike lanes, paths, greenways and trails that provides <br />integrated and continuous corridors for non-motorized transportation and recreation throughout the C ity of <br />Sunrise in a manner that is sensitive to the needs of various user groups, the natural and built environment, <br />the management and maintenance, and potential funding capabilities of local government. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Miramar Parkway & Miramar Boulevard Median <br />Enhancements, Miramar, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />The project is along Miramar Parkway from the Florida Turnpike to Palm Avenue and along Miramar Boulevard <br />from University Drive to Palm Avenue. The project includes landscaping and hardscape for two main <br />thoroughfares through the City of Miramar. The medians lack aesthetic appeal and require various beautification <br />enhancements. This is Phase I of a multi-phased project. The project requires permitting through the City and <br />Broward County Construction and Highway Engineering Department. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />NE 34th Court Complete Streets Project, (from NE 2nd <br />Avenue to Dixie Highway), Oakland Park, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2012 - 2013 <br />CONSTRUCTION (If applicable) <br />2013 - 2014 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Principal Landscape Architect for the landscape, streetscape and irrigation design for the roadway reconstruction <br />design of approximately 0.60 miles. Estimated Construction Cost: $2.2 Million. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />North Central County Neighborhood Improvements, <br />Broward County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2004 <br />CONSTRUCTION (If applicable) <br />2012 (Phased) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Principal Landscape Architect Preparation of Basis of Design Report, Contract Documents, Permitting and <br />Construction Management for 980-acre retrofit infrastructure and landscape improvements within <br />unincorporated Broward County. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Central County Neighborhood Improvements, <br />Broward County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />1996 <br />CONSTRUCTION (If applicable) <br />2006 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Principal Landscape Architect Preparation of Basis of Design Report, Construction Documents, Permitting <br />and Construction Management for 1,800 acre retrofit infrastructure and landscape improvements within <br />unincorporated Broward County. <br /> <br />E | Page 21