|
<br /> STANDARD FORM 330
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Joseph D. Handley, R.L.A.
<br />13. ROLE IN THIS CONTRACT
<br />Lead Landscape Architect
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />35
<br />b. WITH CURRENT FIRM
<br />30
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Clemson University, B.S. in Ornamental Horticulture
<br />(1980); University of Georgia & Louisiana St. University,
<br />Master in Landscape Architecture Studies (1984)
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Professional Registered Landscape Architect
<br />Florida Registration No. 1368 (1990)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />- American Society of Landscape Architects - CPTED Certification (August 1999)
<br />
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Bicycle/Pedestrian Greenway & Trails Master Plan
<br />Sunrise, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Handley was the CTA Principal-in-Charge for the preparation of the Bicycle / Pedestrian Greenways & Trails
<br />Master Plan. The Plan defines a system of sidewalks, bike lanes, paths, greenways and trails that provides
<br />integrated and continuous corridors for non-motorized transportation and recreation throughout the C ity of
<br />Sunrise in a manner that is sensitive to the needs of various user groups, the natural and built environment,
<br />the management and maintenance, and potential funding capabilities of local government.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Miramar Parkway & Miramar Boulevard Median
<br />Enhancements, Miramar, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If applicable)
<br />2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />The project is along Miramar Parkway from the Florida Turnpike to Palm Avenue and along Miramar Boulevard
<br />from University Drive to Palm Avenue. The project includes landscaping and hardscape for two main
<br />thoroughfares through the City of Miramar. The medians lack aesthetic appeal and require various beautification
<br />enhancements. This is Phase I of a multi-phased project. The project requires permitting through the City and
<br />Broward County Construction and Highway Engineering Department.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />NE 34th Court Complete Streets Project, (from NE 2nd
<br />Avenue to Dixie Highway), Oakland Park, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012 - 2013
<br />CONSTRUCTION (If applicable)
<br />2013 - 2014
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Principal Landscape Architect for the landscape, streetscape and irrigation design for the roadway reconstruction
<br />design of approximately 0.60 miles. Estimated Construction Cost: $2.2 Million.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />North Central County Neighborhood Improvements,
<br />Broward County, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2004
<br />CONSTRUCTION (If applicable)
<br />2012 (Phased)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Principal Landscape Architect Preparation of Basis of Design Report, Contract Documents, Permitting and
<br />Construction Management for 980-acre retrofit infrastructure and landscape improvements within
<br />unincorporated Broward County.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Central County Neighborhood Improvements,
<br />Broward County, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />1996
<br />CONSTRUCTION (If applicable)
<br />2006
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Principal Landscape Architect Preparation of Basis of Design Report, Construction Documents, Permitting
<br />and Construction Management for 1,800 acre retrofit infrastructure and landscape improvements within
<br />unincorporated Broward County.
<br />
<br />E | Page 21
|