Laserfiche WebLink
<br /> STANDARD FORM 330 <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />4 <br />21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED <br />Sistrunk Boulevard (NE / NW 6th Street) Streetscape <br />Enhancement Project, Fort Lauderdale, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2011 2012 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br /> a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />City of Fort Lauderdale and <br />Community Redevelopment Agency <br />Mr. Mark Friedman, AIA, <br />NCARB, Project Manager II <br />Phone: (954) 828-5952 <br />Email: MFriedman@fortlauderdale.gov <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Craven Thompson and Associates represented the City of Fort Lauderdale as the Resid ent Project <br />Representative for the Sistrunk Boulevard Streetscape and Enhancement Project providing Construction <br />Engineering and Inspection Services. While the design of this project was managed by the City’s Community <br />Redevelopment Agency (CRA) the construction portion was administered by the City of Fort Lauderdale’s Public <br />Works Department. Primary funding for construction was provided by the Fort Lauderdale CRA. The project <br />area encompasses 2.5 miles of Sistrunk Boulevard (NE/NW 6th Street) from Federal Highway to NW 24th <br />Avenue and includes streetscape and infrastructure improvements consisting of landscaped medians, paver <br />sidewalks, decorative street lighting, traffic signal mast arm installations, undergrounding of overhead utilities, <br />drainage improvements, new water mains and the relocation of various sanitary sewer lines. Work included on- <br />site resolution of construction conflicts and design changes, construction inspection services for quality control <br />and project certification, coordination with FPL, AT&T and Comcast for utility conversions from overhead to <br />underground, close coordination with existing businesses during construction, public relations to keep all <br />parties informed of the ongoing improvements, maintenance of traffic coordination to e nsure continuous <br />access to all affected properties, monthly Pay Application reviews, Change Order reviews and various other <br />construction management duties. This project was partially, federally funded through FDOT LAP funding. <br /> <br /> <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />a. <br />(1) FIRM NAME <br />Craven Thompson & Associates, <br />Inc. <br />(2) FIRM LOCATION (City and State) <br />3563 NW 53rd Street <br />Fort Lauderdale, Florida 33309 <br />(3) Role <br />Prime - Resident Project Representative, <br />Construction Engineering Inspection, <br />Surveying, Landscape Architectural Services <br />b. <br />(1) FIRM NAME <br />Masuen Consulting, LLC <br /> <br /> <br />(2) FIRM LOCATION (City and State) <br />32801 Highway 441 N. #293 <br />Okeechobee, Florida 34972 <br />(3) Role <br />Subconsultant - Landscape Irrigation Design <br />c. <br />(1) FIRM NAME <br />Hillers Electrical Engineering, <br />Inc. <br />(2) FIRM LOCATION (City and State) <br />23257 State Road 7, Suite 100 <br />Boca Raton, Florida 33428 <br />(3) Role <br />Subconsultant - Electrical Engineering & Lighting <br />d. <br />(1) FIRM NAME <br /> <br /> <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br /> <br />E | Page 26