Laserfiche WebLink
STANDARD FORM 330 (6/2004) <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />James Kappes, P.E. <br />13. ROLE IN THIS CONTRACT <br />Project Engineer <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />13 <br />b. WITH CURRENT FIRM <br />13 <br />15. FIRM NAME AND LOCATION (City and State) <br />Hillers Electrical Engineering, Boca Raton, FL. <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />BSEE/2005/Electrical Engineering <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />FL/#71499 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />James Kappes, P.E. brings to this project over 13 years of electrical design and project management experience on <br />major air carrier aviation airport runways, taxiways and apron edge lighting systems, in strumentation landing systems, <br />airfield electrical vaults, water and wastewater facilities, water management pumping stations, lift stations, state -of-the- <br />art distributed control systems, DOT expressways, interchanges, value engineering, energy audits, cos t estimates, <br />testing, startups, lighting systems, security systems, fire alarm system, low and medium voltage distribution systems, <br />normal and stand-by generation, short circuit calculations, fault current calculations, protective device coordination , arc <br />flash analysis, and power, control, instrumentation for facilities in the U.S. and internationally. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Opa-Locka Executive Airport Site Improvement Project <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Preformed electrical design services for the Site Improvement Project at Opa-Locka Executive Airport. Project <br />included demolition of existing site and roadway lighting systems, relocation of existing FP&L overhead distribution <br />systems, relocation of existing AT&T and Comcast communication systems, new FP&L, AT&T and Comcast <br />underground ductbank systems, new lift station, and new road lighting systems. Electrical construction cost: $2.6M. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />PBIA Golfview Infrastructure Phase 1, Palm Beach International <br />Airport, West Palm Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013 <br />CONSTRUCTION (If applicable) <br />2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Designed electrical communication infrastructure for new PBIA Golfview Development, FP&L / AT&T / Comcast / <br />FiberNet coordination, roadway lighting systems, ductbank and manhole systems, relocation of apron lighting <br />systems, lift station power and control per PBC standards, FAA coordination, and FDOT design and coordination. <br />Projected electrical construction cost: $2.16M. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />City of Miami Beach – Venetian Islands Bid Package C <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2011 <br />CONSTRUCTION (If applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Performed electrical design and construction services for 2.5 miles of new roadway lighting for Rivo Alto, Di Lido and <br />San Marino Islands. Included roadway photometrics, roadway lighting systems, new conduit and conductor systems <br />and electrical service points. Electrical construction cost: $1.1M. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />City of Aventura – Biscayne Blvd (US1) Roadway Lighting <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2011 <br />CONSTRUCTION (If applicable) <br />2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Performed electrical design and construction services for replacement of the 2.5 miles of Biscayne Blvd (US1) <br />Roadway Lighting System in the City of Aventura. The existing lighting system was comprised of cobra head fixtures <br />on aluminum light poles that did not fit with the City’s Architectural Scheme. Included roadway photometrics, <br />roadway lighting systems, new conduit and conductor systems and electrical service points. Electrical construction <br />cost: $3M. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />City of Miami Beach – Neighborhood No.1/Biscayne Point <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2008 <br />CONSTRUCTION (If applicable) <br />2011 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Performed electrical design and construction services for 6 miles of new roadway lighting for Biscayne Point. <br />Included roadway photometrics, roadway lighting systems, new conduit and conductor systems and electrical service <br />points. Electrical construction cost: $2.5M. <br /> <br />E | Page 40