Laserfiche WebLink
STANDARD FORM 330 (6/2004) <br /> <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each person) <br />12. NAME <br />Amy L. Champagne-Baker, P.E. <br />13. ROLE IN THIS CONTRACT <br />Senior Project Engineer <br />14. YEARS EXPEREINCE <br />a. TOTAL <br />21 <br />b. WITH CURRENT FIRM <br />21 <br />15. FIRM NAME AND LOCATION (City and State) <br />Hillers Electrical Engineering, Inc, Boca Raton, Florida <br />16. EDUCATION (Degree and Specialization) <br />BSEE/1997/Electrical Engineering <br />17. CURRENT PROFIESSIONAL REGISTRATION (State and Discipline) <br />Florida Professional Engineer-73735 <br />CT Professional Engineer- #27854 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Proficiency with SKM Power Tools for Windows DAPPER, CAPTOR, Arc Flash and TMS; AutoCAD, LitePRO and various <br />generator sizing programs. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Broward County Water and Waste Services – NRWWTP Facility <br />Improvements Project 9195 Phase III (3) Solids <br />(2) YEAR COMPLETED: <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (if applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />Project Engineer – Design electrical and control distribution systems for four (4) new motor control centers, modifications to six (6) <br />motor control centers, two (2) new centrifuges, new belt filter presses, new grinder pumps, new subnate recirculation pumps, new <br />skimmers, various new VFDs located in the Thickener Building, Southern Digester, Northern Digester and Dewatering Building. <br />Included on-site verifications, reviewing of record documentation, design of new lighting systems, coordination between various <br />design and construction projects. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Broward County Water and Waste Services – NRWWTP Facility <br />Improvements Project 9195 Phase III (3) Biologicals <br />(2) YEAR COMPLETED: <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (if applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />Project Engineer – Design electrical and control distribution systems for four (4) new motor control centers for four (4) RAS pump <br />stations, replacement of VFDs for RAS pumps, RAS meter vaults, replacement of WAS pump systems, replacement of Scum <br />Pump station, replacement of existing electrical equipment and panelboards as well as replacement of all existing conduit and <br />conductors systems with replacement of lighting systems. Included on-site verifications, reviewing of record documentation, design <br />of new lighting systems, coordination between various design an d contruction projects. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Palm Beach County Department of Airports – Generator System <br />Replacement, West Palm Beach, FL <br />(2) YEAR COMPLETED: <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (if applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />Project Engineer – Designed for replacement of three (3) existing 1 Megawatt 4160V Generators with two (2) new 2 Megawatt <br />Generators and replacement of associated 4160V Generator Paralleling Switchgear. Included on-site verifications, testing and <br />calculations, designed all power, control and lighting systems, fire alarm system, 4160V emergency power, temporary generator <br />systems, and integration with existing Facility Management and Buildin g Automation Systems. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Palm Beach County John Prince Memorial Park High Voltage Distribution <br />Replacement <br />(2) YEAR COMPLETED: <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (if applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />Project Engineer – Designed replacement of existing overhead high voltage distribution system to a new underground distribution <br />system for the existing park. Designed new underground 26KV electrical distribution system with 21-new dual voltage 26kV/13.2 KV <br />transformers for a future planned transition to a 13.2KV distribution system, reconnected all existing campgrond services, restrooms <br />and facilities. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />City of West Palm Beach – 50 Lift Station Short Circuit, Device Coordination & <br />Arc Flash Analysis <br />(2) YEAR COMPLETED: <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (if applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />Project Engineer – Performed a Short Circuit, Device Coordination & Arc Flash Analysis on 50 Lift stations electrical power <br />distribution systems for compliance with National Electrical Safety Code 2015 (NFPA 70E), National Electrical Code 2008 (NFPA <br />70) and IEE 1584. Included field visit for documention of the existing electrical systems, created model in SKM Power Systems to <br />calculate the available short circuit fault currents; identified equipment below that of the associated available fault current; and <br />performed arc flash evaluation to identify the proper personnel protective clothing for working on live equipment. Implemented <br />recommendations for protective device settings and installed Arc flash labels on electrical equipment at all locations. <br />X <br />X <br />X <br />X <br />X Check if project performed with current firm <br />Check if project performed with current firm <br />Check if project performed with current firm <br />Check if project performed with current firm <br />Check if project performed with current firm <br />E | Page 41