STANDARD FORM 330 (6/2004)
<br />
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each person)
<br />12. NAME
<br />Amy L. Champagne-Baker, P.E.
<br />13. ROLE IN THIS CONTRACT
<br />Senior Project Engineer
<br />14. YEARS EXPEREINCE
<br />a. TOTAL
<br />21
<br />b. WITH CURRENT FIRM
<br />21
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Hillers Electrical Engineering, Inc, Boca Raton, Florida
<br />16. EDUCATION (Degree and Specialization)
<br />BSEE/1997/Electrical Engineering
<br />17. CURRENT PROFIESSIONAL REGISTRATION (State and Discipline)
<br />Florida Professional Engineer-73735
<br />CT Professional Engineer- #27854
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Proficiency with SKM Power Tools for Windows DAPPER, CAPTOR, Arc Flash and TMS; AutoCAD, LitePRO and various
<br />generator sizing programs.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Broward County Water and Waste Services – NRWWTP Facility
<br />Improvements Project 9195 Phase III (3) Solids
<br />(2) YEAR COMPLETED:
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (if applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Project Engineer – Design electrical and control distribution systems for four (4) new motor control centers, modifications to six (6)
<br />motor control centers, two (2) new centrifuges, new belt filter presses, new grinder pumps, new subnate recirculation pumps, new
<br />skimmers, various new VFDs located in the Thickener Building, Southern Digester, Northern Digester and Dewatering Building.
<br />Included on-site verifications, reviewing of record documentation, design of new lighting systems, coordination between various
<br />design and construction projects.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Broward County Water and Waste Services – NRWWTP Facility
<br />Improvements Project 9195 Phase III (3) Biologicals
<br />(2) YEAR COMPLETED:
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (if applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Project Engineer – Design electrical and control distribution systems for four (4) new motor control centers for four (4) RAS pump
<br />stations, replacement of VFDs for RAS pumps, RAS meter vaults, replacement of WAS pump systems, replacement of Scum
<br />Pump station, replacement of existing electrical equipment and panelboards as well as replacement of all existing conduit and
<br />conductors systems with replacement of lighting systems. Included on-site verifications, reviewing of record documentation, design
<br />of new lighting systems, coordination between various design an d contruction projects.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Palm Beach County Department of Airports – Generator System
<br />Replacement, West Palm Beach, FL
<br />(2) YEAR COMPLETED:
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (if applicable)
<br />2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Project Engineer – Designed for replacement of three (3) existing 1 Megawatt 4160V Generators with two (2) new 2 Megawatt
<br />Generators and replacement of associated 4160V Generator Paralleling Switchgear. Included on-site verifications, testing and
<br />calculations, designed all power, control and lighting systems, fire alarm system, 4160V emergency power, temporary generator
<br />systems, and integration with existing Facility Management and Buildin g Automation Systems.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Palm Beach County John Prince Memorial Park High Voltage Distribution
<br />Replacement
<br />(2) YEAR COMPLETED:
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (if applicable)
<br />2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Project Engineer – Designed replacement of existing overhead high voltage distribution system to a new underground distribution
<br />system for the existing park. Designed new underground 26KV electrical distribution system with 21-new dual voltage 26kV/13.2 KV
<br />transformers for a future planned transition to a 13.2KV distribution system, reconnected all existing campgrond services, restrooms
<br />and facilities.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of West Palm Beach – 50 Lift Station Short Circuit, Device Coordination &
<br />Arc Flash Analysis
<br />(2) YEAR COMPLETED:
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (if applicable)
<br />2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Project Engineer – Performed a Short Circuit, Device Coordination & Arc Flash Analysis on 50 Lift stations electrical power
<br />distribution systems for compliance with National Electrical Safety Code 2015 (NFPA 70E), National Electrical Code 2008 (NFPA
<br />70) and IEE 1584. Included field visit for documention of the existing electrical systems, created model in SKM Power Systems to
<br />calculate the available short circuit fault currents; identified equipment below that of the associated available fault current; and
<br />performed arc flash evaluation to identify the proper personnel protective clothing for working on live equipment. Implemented
<br />recommendations for protective device settings and installed Arc flash labels on electrical equipment at all locations.
<br />X
<br />X
<br />X
<br />X
<br />X Check if project performed with current firm
<br />Check if project performed with current firm
<br />Check if project performed with current firm
<br />Check if project performed with current firm
<br />Check if project performed with current firm
<br />E | Page 41
|