Laserfiche WebLink
CONSULTING ENGINEERING SERVICES FOR <br />Golden Shores Utility Undergrounding and Roadway Improvements <br />E–11IWOP41002.18w_Sunny Isles Beach Golden Shores Undergrounding.indd <br />Kaitlin Dombrowski, E.I. | Civil and Utilities Engineering <br />Kaitlin has three years of experience serving a wide variety of clients on water resources projects <br />involving water mains, pump stations, water treatment plants, and other utility design projects. <br />Kaitlin earned both her Bachelor of Science in Civil Engineering and Master of Engineering in <br />Environmental Engineering with a focus in Hydrological Sciences from the University of Florida. <br />She is a Registered Engineering Intern in Florida and is a member of the American Society of <br />Civil Engineers (ASCE) and its technical source for environmental and water-related issues, <br />the Environmental Water Resources Institute (EWRI). Her computer software experience <br />includes ArcMAP (GIS) and AutoCAD. Kaitlin is serving on the project team for the Town-wide <br />undergrounding of utilities in Palm Beach. <br />George Puig, PLA | Landscape Architecture <br />With 28 years of professional practice in South Florida, George is a registered landscape <br />architect with experience on a number of projects throughout the United States, Latin America, <br />and abroad, within both private- and public-sectors. George’s project knowledge has been <br />built by his critical involvement in master planning, urban design/streetscape, site development, <br />and conceptual and final design for resorts, hotels, single-family, multifamily, mixed-use, and <br />entertainment/recreational facility projects. His responsibilities include management of designers <br />and planners, marketing, recruiting, team leadership and project management, and ensuring that <br />our clients receive the best possible service. <br />Kim Misek, ASLA | Landscape Architecture <br />Kim has 12 years of experience as a landscape analyst. She prepares hardscape plans, irrigation <br />plans and custom detailing through construction documents and construction phase services. <br />Kim’s focus is specifically in the detailed design of municipal parks and streetscapes, urban infill <br />and overall land development projects for a variety of local and nationally recognized clients. She <br />is experienced with landscape design, site planning, construction document preparation, and in <br />preparing presentation graphics—both digitally and by hand. <br />Burt Baldo, P.E. | Roadway and Traffic <br />Burt has 25 years of extensive experience in the fields of highway design, drainage design, <br />and traffic operations plans. He has worked on projects for FDOT Districts Three, Four, and <br />Six. His principal areas of practice include roadway design, preliminary engineering studies, <br />drainage design, stormwater permitting, pavement design, utility coordination, maintenance of <br />traffic, roadway lighting design, signing and pavement marking, traffic signalization, and traffic <br />planning. Burt is serving as project manager responsible for developing vertical and horizontal <br />alignments, providing drainage design, signing and pavement markings, and signalization plans <br />for this corridor on the NE 2nd Avenue reconstruction from NE 91st Street to NE 105th Street <br />project for the City of Miami; providing traffic operational analyses for nine intersection locations <br />for the Miami-Dade County Public Works Department; and providing roadway improvements on NE 17th Street, NE 17th <br />Terrace, NE 2nd Avenue, N. Miami Avenue, and Biscayne Boulevard for the Bayview Market Place in Miami-Dade County.