|
CONSULTING ENGINEERING SERVICES FOR
<br />Golden Shores Utility Undergrounding and Roadway Improvements
<br />E–11IWOP41002.18w_Sunny Isles Beach Golden Shores Undergrounding.indd
<br />Kaitlin Dombrowski, E.I. | Civil and Utilities Engineering
<br />Kaitlin has three years of experience serving a wide variety of clients on water resources projects
<br />involving water mains, pump stations, water treatment plants, and other utility design projects.
<br />Kaitlin earned both her Bachelor of Science in Civil Engineering and Master of Engineering in
<br />Environmental Engineering with a focus in Hydrological Sciences from the University of Florida.
<br />She is a Registered Engineering Intern in Florida and is a member of the American Society of
<br />Civil Engineers (ASCE) and its technical source for environmental and water-related issues,
<br />the Environmental Water Resources Institute (EWRI). Her computer software experience
<br />includes ArcMAP (GIS) and AutoCAD. Kaitlin is serving on the project team for the Town-wide
<br />undergrounding of utilities in Palm Beach.
<br />George Puig, PLA | Landscape Architecture
<br />With 28 years of professional practice in South Florida, George is a registered landscape
<br />architect with experience on a number of projects throughout the United States, Latin America,
<br />and abroad, within both private- and public-sectors. George’s project knowledge has been
<br />built by his critical involvement in master planning, urban design/streetscape, site development,
<br />and conceptual and final design for resorts, hotels, single-family, multifamily, mixed-use, and
<br />entertainment/recreational facility projects. His responsibilities include management of designers
<br />and planners, marketing, recruiting, team leadership and project management, and ensuring that
<br />our clients receive the best possible service.
<br />Kim Misek, ASLA | Landscape Architecture
<br />Kim has 12 years of experience as a landscape analyst. She prepares hardscape plans, irrigation
<br />plans and custom detailing through construction documents and construction phase services.
<br />Kim’s focus is specifically in the detailed design of municipal parks and streetscapes, urban infill
<br />and overall land development projects for a variety of local and nationally recognized clients. She
<br />is experienced with landscape design, site planning, construction document preparation, and in
<br />preparing presentation graphics—both digitally and by hand.
<br />Burt Baldo, P.E. | Roadway and Traffic
<br />Burt has 25 years of extensive experience in the fields of highway design, drainage design,
<br />and traffic operations plans. He has worked on projects for FDOT Districts Three, Four, and
<br />Six. His principal areas of practice include roadway design, preliminary engineering studies,
<br />drainage design, stormwater permitting, pavement design, utility coordination, maintenance of
<br />traffic, roadway lighting design, signing and pavement marking, traffic signalization, and traffic
<br />planning. Burt is serving as project manager responsible for developing vertical and horizontal
<br />alignments, providing drainage design, signing and pavement markings, and signalization plans
<br />for this corridor on the NE 2nd Avenue reconstruction from NE 91st Street to NE 105th Street
<br />project for the City of Miami; providing traffic operational analyses for nine intersection locations
<br />for the Miami-Dade County Public Works Department; and providing roadway improvements on NE 17th Street, NE 17th
<br />Terrace, NE 2nd Avenue, N. Miami Avenue, and Biscayne Boulevard for the Bayview Market Place in Miami-Dade County.
|