Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Burt L. Baldo, P.E. <br />13. ROLE IN THIS CONTRACT <br />Design/Construction Oversight, Roadway <br />and Traffic <br />14. YEARS EXPERIENCE <br />a. TOTAL <br /> 25 <br />b. WITH CURRENT FIRM <br /> 19 <br />15. FIRM NAME AND LOCATION (City and State) <br />Kimley-Horn and Associates, Inc., Coral Gables, FL <br />16. EDUCATION (Degree and Specialization) <br />Bachelor of Science / Civil Engineering / Florida International University <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />FL / Professional Engineer / 53120 / 1998 <br />Adv Work Zone Traffic / 37 / 2013 <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br /> 19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Town-Wide Undergrounding of Utilities Program <br />Palm Beach <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project engineer. Subsequent to a state of Florida mandate that FPL “storm harden” all vital infrastructure and utility lines <br />statewide, resulting in the installation of taller, concrete electric poles, the Town of Palm Beach chose instead to convert all <br />aerial electric, communication, and cable lines to an underground location. Kimley-Horn serves as program manager and prime <br />consultant designing and permitting the underground conversion process in close coordination with FPL, AT&T and Comcast. <br />Kimley-Horn first developed a master plan to outline the schedule, sequencing, phasing, management of traffic impacts, project <br />delivery methods, data collection, public outreach, design criteria, and projected costs. The benefits of undergrounding thes e <br />utilities include improved neighborhood aesthetics, increased service reliability, and increased levels of safety as the lines are <br />no longer exposed. The entire program, which began in 2016, is expected to take 10 years to complete. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Alton Road PD&E Study (5th Street to Michigan Avenue) <br />FDOT District Six <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Lead project engineer and engineer of record for a 1.5 -mile PD&E study in Miami Beach. The multi-use corridor serves as a <br />gateway to one of Florida’s most popular tourist destinations, South Beach. Improvements were developed to address safety, <br />drainage, traffic flow, pavement conditions, bicycle facilities, pedestrian facilities, mass transit, parking, and landscapin g. The <br />project included extensive public outreach, including the formation of a project advisory group of affect ed residents and <br />business owners, presentations to a number of advisory boards of the City of Miami Beach and the Miami -Dade Metropolitan <br />Planning Organization, and the endorsement of the study’s preferred alternative by the City of Miami Beach’s Commissio n. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Reconstruction of Krome Avenue from South of SW 296 St to <br />South of SW 232 St, FDOT District Six <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project manager for the team providing roadway, signing and marking, signalization, lighting, structures and landscape design . <br />This project is part of the Krome Avenue South Corridor and has several environmentally sensitive areas. This segment of <br />Krome Avenue handles part of the main freight activity in South and West Miami-Dade County, with a daily truck percentage of <br />15%. Many utilities are being relocated and some segments of the corridor have undergrounding of overhead utilities. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Venetian Causeway Improvements from Bayshore Drive (Miami) to <br />Alton Road (Miami Beach), Miami-Dade County <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project manager for the Kimley-Horn team responsible for the professional services, master planning, and the preparation of <br />complete plans for the beautification of the Historic Venetian Causeway. Responsible for developing vertical and horizontal <br />alignments, coordinating drainage design and signing and pavement markings, decora tive lighting, <br />landscape/hardscape/irrigation and signalization plans for this corridor. The project includes extensive coordination with th e City <br />of Miami and the City of Miami Beach to resolve flooding issues. It also required an extensive public involve ment program to <br />address community concerns. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />MDX Design Engineering for SR 874 (Don Shula Expressway) from <br />Kendall Drive to SR 826, Miami <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2011 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Deputy project manager for design engineering services for SR 874 (Don Shula Expressway) roadway modifications from south <br />of SW 88th Street (Kendall Drive) to south of SR 826 (Palmetto Expressway)/SR 874 interchange. The project consisted of the <br />widening of SR 874 and included complex roadway design, drainage design, signing and marking, lighting, signalization, <br />retaining walls, noise barrier walls, bridge widening plans, permitting, and public involvement services. The nature of the project <br />changed and was re-procured as a Design-Build project. Kimley-Horn prepared 99% design plans and the subsequent design- <br />build criteria package. <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br /> <br />