E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Leonte I. Almonte, P.E.
<br />13. ROLE IN THIS CONTRACT
<br />Design/Construction Oversight, Roadway
<br />and Traffic
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br /> 15
<br />b. WITH CURRENT FIRM
<br /> 12
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Kimley-Horn and Associates, Inc., Coral Gables, FL
<br />16. EDUCATION (Degree and Specialization)
<br />Master of Science / Transportation Engineering / Florida International University
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and
<br />Discipline)
<br />FL / Professional Engineer / 70822 / 2010
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />
<br /> 19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Master Planning for Village-Wide Undergrounding of Utilities
<br />Key Biscayne
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project engineer. The design and construction of the undergrounding program is anticipated to take multiple years to complete.
<br />The underground program will be broken into multiple phases that can be constructed on an annual basis. In order to balance
<br />potentially competing priorities such as cost, project duration, traffic impacts for this large -scale project, development of a
<br />Master Plan was recommended in order to evaluate these priorities ahead of any detailed design of any single undergrounding
<br />phase.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />I-395 Reconstruction from West of I-95 to McArthur Causeway
<br />FDOT District Six
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012
<br />CONSTRUCTION (If applicable)
<br />2012
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Roadway engineer for site/civil engineering services for the 14-acre Bayfront site that previously housed the Miami Herald
<br />newspaper. Kimley-Horn prepared 15% concept plans for the reconstruction of I-395 from west of I-95 to McArthur Causeway.
<br />This involved intricate analysis of multiple roadway alignment alternatives, improvements to the network of local roads, MOT,
<br />drainage analysis, bridge analysis, modifications to the existing interchange of I -395/SR 836/I-95, signing master plan, utility
<br />analysis and impacts to the PD&E and further re-evaluations. It also included extensive coordination with FDOT, MDX and
<br />stakeholders.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />All Electronic Tolling (AET) Phase 5C
<br />Florida’s Turnpike Enterprise
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project manager for the design and preparation of final construction documents to convert existing toll plazas to all -electronic
<br />tolling from Sawgrass Expressway to south of the Lantana Mainline Toll Plaza. Existing toll plazas and gantries will be
<br />demolished and new AET tolling points will be constructed. Services also include specifications package preparation, signing
<br />and pavement marking analysis and plans, lighting design, ITS facility design, utility coordination, and landscaping plans.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Flood Mitigation Area South
<br />Medley
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project engineer and engineer of record for roadway and drainage improvements for over 4,000 linear feet of roadway within
<br />the Flood Mitigation Area in the Town of Medley. Responsible for development of roadway and drainage cross sections,
<br />roadway alignment, temporary drainage plans for an emergency trunk line, pre - and post-design water treatment calculations,
<br />exfiltration trench calculations and design, utility coordination, stormwater pollutions prevention plans (SWPPP), review of as -
<br />builts, and signing and pavement markings. The Town seeks to alleviate frequent flooding within the basin known as the Flood
<br />Mitigation Area as well as upgrade the existing roadway, which has deteriorated in part due to the absence of adequate
<br />stormwater management facilities. As one of the largest public infrastructure undertakings in the Town’s history, this projec t is
<br />expected to alleviate flooding and increase roadway capacity in the area. The combination of improvements in conjunction with
<br />ongoing private land development in the area is revitalizing the industrial Town of Medley.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />I-75 Express Lanes Project (Segments A&B) Design-Build – From
<br />NW 170th Street to South of Miramar Parkway, FDOT District Four
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project engineer for 3-mile design-build project from south of Miami Gardens Drive in Miami-Dade County to south of Miramar
<br />Parkway in Broward County, including the HEFT interchange. The project will improve I-75’s managed lanes network for all
<br />motorists and improve mobility, relieve congestion, provide additional travel options and accommodate future growth in the
<br />area. Responsibilities for this segment include signing and pavement marking plans, ITS plans development, and post -design
<br />and construction phase services. Construction started in late 2014 with completion expected later this year.
<br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />
|