Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Kimberlee A. Misek, ASLA <br />13. ROLE IN THIS CONTRACT <br />Landscape Architecture <br />14. YEARS EXPERIENCE <br />a. TOTAL <br /> 12 <br />b. WITH CURRENT FIRM <br /> 12 <br />15. FIRM NAME AND LOCATION (City and State) <br />Kimley-Horn and Associates, Inc., Coral Gables, FL <br />16. EDUCATION (Degree and Specialization) <br />Bachelor of Landscape Architecture / University of Arkansas <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br /> <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br /> 19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Parks Master Plan <br />Cutler Bay <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2009 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project analyst. Kimley-Horn provided master planning services for the Town of Cutler Bay to assess the condition and provide <br />improvement recommendations for eight Town parks. The team held public meetings with citizens, Town staff, and public <br />officials for input. The master plan included a physical inventory and site assessment of the existing parks and park system and <br />made proposed recommendations. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />North Park <br />Doral <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2014 <br />CONSTRUCTION (If applicable) <br />2014 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Assisted with landscape planning for the Kimley-Horn team who prepared the conceptual plan of a 22-acre park located on the <br />south west corner of NW 97th Avenue and the future NW 77th Terrace in Doral, Florida. The park contains both active and <br />passive recreational activities which are arranged around a large proposed lake wi th recreated wetlands and a 6,000-square- <br />foot multi-purpose building and Nature Center with a large viewing terrace. All of the active sports such as multi -use fields, <br />tennis courts, basketball courts, and playground are located towards the western portion of the park while the passive activities <br />such as the kayak launch, walking/exercise trails, picnic shelters, wetland boardwalk, fishing pier, and educational boardwal k <br />are located towards the eastern portion of the site surrounding the lake. Support facil ities such as a maintenance building, on- <br />street parking, and surface parking lot are also part of the plan. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Serene Park <br />Doral <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013 <br />CONSTRUCTION (If applicable) <br />2013 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Landscape analyst. Kimley-Horn prepared the conceptual plan and construction documents for a two-acre park across from the <br />recently completed City Hall in Downtown Doral. The concept for the park was based on “offering a quiet respite amidst the <br />urban context in order to connect your mind, body, and spirit and discover about yourself, about your community, and about <br />your place in the world.” Park amenities included a labyrinth, sunken garden, yoga/tai -chi lawn, contemplative pond, tree <br />bosque, reading rooms/seating circles, scent garden water features, plazas, and passive trails. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Downtown Mobility Hub Streetscape <br />Fort Lauderdale <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Landscape analyst for Kimley-Horn’s design services under a continuing services contract. Kimley-Horn is providing landscape <br />architecture design, planning, traffic engineering, and civil engineering services for the revitalization of the existing str eetscape <br />in Downtown Fort Lauderdale. The goal is to create a pedestrian -friendly environment by adding walk/bike lanes and creating <br />separation between traffic and pedestrian spaces—this includes adjusting lane lengths and altering bus lanes. Kimley-Horn is <br />coordinating with various stakeholders (Broward County, Broward County Transportation, Sun Trolley, Brightline Rail) and <br />preparing workshop-style presentations for several streetscape options. Our team recently completed 30% plans for the proj ect, <br />with 60% plans expected this month (August 2018). <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Landscape Design Services for Beautification of US 1 Medians <br />Palmetto Bay <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Landscape analyst. Kimley-Horn is developing the planting and irrigation designs for existing US 1 medians between SW 136th <br />and SW 184th Street consisting of 24 medians spanning 6 miles. The planting design incorporates new trees, palms, shrubs, <br />and groundcovers into the medians following FDOT design standards. The planting and irrigation contract documents were <br />presented to FDOT for right-of-way landscape permits. The scope includes conceptual design, planting and irrigation design, <br />and permit processing assistance. <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br /> <br />