|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />David S. Goldman, P.G.
<br />13. ROLE IN THIS CONTRACT
<br />Environmental and Coastal
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br /> 29
<br />b. WITH CURRENT FIRM
<br /> 18
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Kimley-Horn and Associates, Inc., Jacksonville, FL
<br />16. EDUCATION (Degree and Specialization)
<br />Master of Science / Geology / University of Florida
<br />Bachelor of Science / Geology / University of Florida
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />FL / Professional Geologist / PG1573 / 1993
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />
<br /> 19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Midtown Miami Brownfield Redevelopment (includes
<br />Hydrogeologic Study, Former Buena Vista Railroad Yard), Miami
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2009
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project manager for the remediation of this 56-acre brownfield which is the largest redevelopment project in the City of Miami.
<br />The site was a 100-year-old FEC rail yard with contaminants ranging from petroleum hydrocarbons to metals. The remediation
<br />activities were integrated into the site overall development plan to reduce cleanup costs by millions of dollars while allowi ng for
<br />the full development of the property. The site received an SRCO in 2006. In addition, Kimley-Horn designed all public
<br />infrastructure, including roadways and utilities, and has provided traffic, landscape architecture, and urban planning servic es for
<br />Midtown Miami. This project is an example of the turnkey type of brownfield redevelopment services Kimley-Horn offers, and we
<br />are very proud of the fact that Midtown Miami was the recipient of the EPA Region 4 2009 Phoenix Award, the nation’s most
<br />prestigious award for brownfield redevelopment.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Florida Keys Electrical Cooperative Pole Yard
<br />Marathon
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2009
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project manager for the assessment and remediation of this arsenic -contaminated site. This included an evaluation of
<br />background concentrations of arsenic, off-site levels of arsenic in soil, and an analysis of tidal effects on the groundwater
<br />contaminant plume. The site assessment report (SAR) for this site was approved without comments and a remedial action plan
<br />(RAP) was put in place. As a part of the RAP, Kimley-Horn successfully convinced the FDEP that soil could be managed on-site
<br />and that, through the use of engineering and institutional controls, both soil and groundwater arsenic impacts could be
<br />addressed. The site received an SRCO in 2009.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Baker Park
<br />Naples
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Hydrogeologist. Kimley-Horn is currently providing full design services for Baker Park on the Gordon River in Naples. Design
<br />components include a large multi-purpose concession building, playground with integrated splash pad, Founder’s Garden, day
<br />dock, canoe/kayak launch, knoll/overlook, stormwater treatment marsh, small amphitheater a rea, sunrise terrace, waterfront
<br />boardwalks, and a ½ mile trail connecting to the Gordon River Greenway bridge. Kimley-Horn is providing landscape
<br />architecture, civil, environmental, and permitting/construction phase services for this $14.5 million, high -profile planned
<br />destination.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Town of Palm Beach Landfills
<br />Palm Beach
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Hydrogeologist providing technical oversight of monitoring being conducted at the Skees Road and O keechobee Boulevard
<br />landfills. Review consisted of evaluation of cover material, Lon term contaminant trends, groundwater flow. Assisted with
<br />response to Notice of Violation (NOV) from Palm Beach County and evaluated long term human exposure risks and monitoring
<br />requirements.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Gateway Drive Extension Final Design
<br />Altamonte Springs
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012
<br />CONSTRUCTION (If applicable)
<br />2012
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Member of the Kimley-Horn team that provided design, permitting, bidding support, and construction phase services for the
<br />Gateway Drive Extension project. This project involved the new construction of approximately one mile of four -lane, divided
<br />urban roadway from east of Forest City Road to Keller Road. It also included construction of a new two -lane, urban roadway
<br />and widening for auxiliary lanes along Maitland Boulevard and Keller Road. The disciplines involved in this project included
<br />roadway, drainage, floodplain, utilities, traffic control, signing/pavement marking, environmental, signalization, structural,
<br />landscaping, permitting and right-of-way-mapping. This project was permitted through Seminole County, SJRWMD, USACE,
<br />FDEP, FEMA, FDOT, and the City of Maitland.
<br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />
|