Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />J. Casey Long, P.E. <br />13. ROLE IN THIS CONTRACT <br />Environmental and Coastal <br />14. YEARS EXPERIENCE <br />a. TOTAL <br /> 22 <br />b. WITH CURRENT FIRM <br /> 1 <br />15. FIRM NAME AND LOCATION (City and State) <br />Kimley-Horn and Associates, Inc., West Palm Beach, FL <br />16. EDUCATION (Degree and Specialization) <br />Bachelor of Science / Civil Engineering / University of Florida <br />Master of Engineering / Structural Engineering / University of Florida <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />FL / Professional Engineer / 56083 / 2001 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br /> 19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Town of Palm Beach, Annie’s Dock <br />Palm Beach <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br />2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Marine Structural Engineer. Served as a senior consultant on the marine aspects of the repair and restoration of Annie’s Dock o <br />the North End of Palm Beach Island. Repairs and restoration included the removal of damaged concrete caps, the elevating of <br />the existing structures, the refurbishment of the existing metal walkways damaged during Hurricane Irma. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Port of Palm Beach, Slip No. 1 and Main Marginal Crane Loading <br />Assessment, Riviera Beach <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Structural Engineer. As a subconsultant to another firm, Kimley-Horn provided a preliminary structural assessment for new <br />cranes at Slip No. 1 and the Main Marginal Wharf Bulkhead. The Port’s tenant is looking to replace the current second- <br />generation crane type with a third-generation crane. Part of the assessment included gathering manufacturer’s data on the <br />cranes, review of the existing construction drawings and design calculations of the bulkhead, and analysis of the existing <br />bulkhead and seawall. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Port of Palm Beach, Maritime Office Building Demolition and <br />Paving (Cargo Yard Development), Riviera Beach <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Civil engineer. As a subconsultant to another firm, as part of the Port of Palm Beach’s plan to demolish the existing five -story <br />Maritime Office Building. The existing FPL overhead power lines and AT&T transmission lines were determined to need to be <br />relocated underground to provide adequate clearance for container handling equipment and stacking. As part of this project <br />Casey was responsible for assessing undergrounding power and communications lines require to be placed underground and <br />providing coordination and consulting services to Client for the undergrounding of these facilities. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />North Wharf Repair, Port of Palm Beach <br />Riviera Beach <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2005 <br />CONSTRUCTION (If applicable) <br />2005 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />Project manager and structural engineer. Responsible for the design of the repairs to this existing bulkhead. Repairs includ ed <br />stripping of existing top 3-feet of the bulkhead concrete cap and replacing with a new section to match new adjacent berths. In <br />addition, new water and electrical utilities were provided and general aesthetic cleanup of berth for use as part of the new <br />Maritime Office Complex and Cruise Terminal Facility. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Port of Miami, Gate Study <br />Miami <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2012 <br />CONSTRUCTION (If applicable) <br />2012 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />Project consultant. Responsible for providing project consulting and coordination for this project which involves the study of the <br />Port’s main and tenant gate systems and operation and evaluated relocation / consolidation of these facilities. Project <br />consulting provided included general site circulation analysis and layout to optimize infrastructure impact and analyze roadway <br />geometry and site space feasibility. <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br /> <br /> <br /> <br />