|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Michael Parsons
<br />13. ROLE IN THIS CONTRACT
<br />Construction Phase Services
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br /> 17
<br />b. WITH CURRENT FIRM
<br /> 3
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Kimley-Horn and Associates, Inc., West Palm Beach, FL
<br />16. EDUCATION (Degree and Specialization)
<br />
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />
<br /> 19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Northwood Railroad Utility Relocations
<br />West Palm Beach
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (If applicable)
<br />2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Construction phase services field representative to verify construction was completed in general accordance with contract
<br />documents. Observations and follow-up field reports included demolition, installation of utilities, pressure testing of new piping,
<br />and site work.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Town-Wide Undergrounding of Utilities Program
<br />Palm Beach
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Construction administrator. Subsequent to a state of Florida mandate that FPL “storm harden” all vital infrastructure and utility
<br />lines statewide, resulting in the installation of taller, concrete electric poles, the Town of Palm Beach chose instead to co nvert
<br />all aerial electric, communication, and cable lines to an underground location. Kimley-Horn serves as program manager and
<br />prime consultant designing and permitting the underground conversion process in close coordination with FPL, AT&T and
<br />Comcast. Kimley-Horn first developed a master plan to outline the schedule, sequencing, phasing, managem ent of traffic
<br />impacts, project delivery methods, data collection, public outreach, design criteria, and projected costs. The benefits of
<br />undergrounding these utilities include improved neighborhood aesthetics, increased service reliability, and increased levels of
<br />safety as the lines are no longer exposed. The entire program, which began in 2016, is expected to take 10 years to complete.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Lift Station 13 Improvements
<br />West Palm Beach
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (If applicable)
<br />2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Construction phase services field representative to verify construction was completed in general accordance with contract
<br />documents. Observations of the construction of a new electrical room addition built on sheet piling, installation of new
<br />generator, VFDs, valve actuators, valves, and flow meters. Also performe d follow-up field reports included demolition,
<br />installation of utilities, pressure testing of new piping, and site work.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Southern Boulevard Bridge Subaqueous 16-inch Water Main
<br />Replacement and Route Study, West Palm Beach
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If applicable)
<br />2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Construction administration. This project involves the design of a 16-inch HDPE pipeline under the Intracoastal Waterway
<br />between the City of West Palm Beach and the Town of Palm Beach. As a result of the Southern Blvd. Bridge reconstruction
<br />project, a 16-inch water main owned by the City of West Palm Beach needed to be relocated. Kimley-Horn provided an initial
<br />route study to identify potential pipeline routes and hydraulic modeling to determine that the pipe diameter could be reduced to
<br />lower construction costs. Kimley-Horn is now providing design, permitting, bidding, and construction phase services for the
<br />project. Permits are being obtained from the U.S. Army Corps of Engineers, Florida Department of Environmental Protection,
<br />and Florida Department of Transportation.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Lift Station 23 Rehabilitation Study
<br />West Palm Beach
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2009
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Construction inspector for the project. The project entails the installation of new pumps and associated piping, the construc tion
<br />of a new electrical room addition, installation of new electrical gear, installation of new variable frequency drives, and the
<br />installation of a new backup generator system. The project also entails minor demolition and site work as well as the
<br />rehabilitation of the existing wet well.
<br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />
<br />
<br />
|