Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Michael Parsons <br />13. ROLE IN THIS CONTRACT <br />Construction Phase Services <br />14. YEARS EXPERIENCE <br />a. TOTAL <br /> 17 <br />b. WITH CURRENT FIRM <br /> 3 <br />15. FIRM NAME AND LOCATION (City and State) <br />Kimley-Horn and Associates, Inc., West Palm Beach, FL <br />16. EDUCATION (Degree and Specialization) <br /> <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br /> <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br /> 19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Northwood Railroad Utility Relocations <br />West Palm Beach <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br />2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Construction phase services field representative to verify construction was completed in general accordance with contract <br />documents. Observations and follow-up field reports included demolition, installation of utilities, pressure testing of new piping, <br />and site work. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Town-Wide Undergrounding of Utilities Program <br />Palm Beach <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Construction administrator. Subsequent to a state of Florida mandate that FPL “storm harden” all vital infrastructure and utility <br />lines statewide, resulting in the installation of taller, concrete electric poles, the Town of Palm Beach chose instead to co nvert <br />all aerial electric, communication, and cable lines to an underground location. Kimley-Horn serves as program manager and <br />prime consultant designing and permitting the underground conversion process in close coordination with FPL, AT&T and <br />Comcast. Kimley-Horn first developed a master plan to outline the schedule, sequencing, phasing, managem ent of traffic <br />impacts, project delivery methods, data collection, public outreach, design criteria, and projected costs. The benefits of <br />undergrounding these utilities include improved neighborhood aesthetics, increased service reliability, and increased levels of <br />safety as the lines are no longer exposed. The entire program, which began in 2016, is expected to take 10 years to complete. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Lift Station 13 Improvements <br />West Palm Beach <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br />2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Construction phase services field representative to verify construction was completed in general accordance with contract <br />documents. Observations of the construction of a new electrical room addition built on sheet piling, installation of new <br />generator, VFDs, valve actuators, valves, and flow meters. Also performe d follow-up field reports included demolition, <br />installation of utilities, pressure testing of new piping, and site work. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Southern Boulevard Bridge Subaqueous 16-inch Water Main <br />Replacement and Route Study, West Palm Beach <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Construction administration. This project involves the design of a 16-inch HDPE pipeline under the Intracoastal Waterway <br />between the City of West Palm Beach and the Town of Palm Beach. As a result of the Southern Blvd. Bridge reconstruction <br />project, a 16-inch water main owned by the City of West Palm Beach needed to be relocated. Kimley-Horn provided an initial <br />route study to identify potential pipeline routes and hydraulic modeling to determine that the pipe diameter could be reduced to <br />lower construction costs. Kimley-Horn is now providing design, permitting, bidding, and construction phase services for the <br />project. Permits are being obtained from the U.S. Army Corps of Engineers, Florida Department of Environmental Protection, <br />and Florida Department of Transportation. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Lift Station 23 Rehabilitation Study <br />West Palm Beach <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2009 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Construction inspector for the project. The project entails the installation of new pumps and associated piping, the construc tion <br />of a new electrical room addition, installation of new electrical gear, installation of new variable frequency drives, and the <br />installation of a new backup generator system. The project also entails minor demolition and site work as well as the <br />rehabilitation of the existing wet well. <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br /> <br /> <br />