|
adjacent areas.
<br />E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Eduardo M. Suarez, PSM
<br />13. ROLE IN THIS CONTRACT
<br />Principal Surveyor & Mapper
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />32
<br />b. WITH CURRENT FIRM
<br />14
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Longitude Surveyors, 7715 NW 48 Street, Doral, FL 33166
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />• Associates Degree in Engineering Studies,
<br />Miami-Dade College 1993
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />• Professional Surveyor & Mapper #LS6313 State of
<br />Florida
<br />• Florida Surveying & Mapping Society
<br />• Florida Engineering Society
<br />• Utility & Engineering Surveying Institute
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc. Micro SBE,DBE,CBE, 15.01- Surveying and Mapping – Land
<br />Surveying, 15.02 – Surveying and Mapping – Aerial Photogrammetry - 15.03- Underground Utility Location, 8.1- Control Surveying, 8.2-Design,
<br />Right-of-Way & Construction Surveying, and 8.4- Right-of-Way Mapping, FES Chapter Director (Miami), ASCE 2016 Employer of Year
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Aviation Blvd. Marathon Shores, from the intersection of Aviation Blvd
<br />and US 1 Northeast to Aviation Blvd. terminus at 109th Street Gulf.
<br />Monroe County, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Principal in Charge: Longitude Surveyors performed and prepared a Topographic Survey from the intersection of Aviation Boulevard and
<br />US 1 East Northeast to Aviation Boulevard. Longitude set control points on the centerline at 500-foot intervals. Points have State Plane
<br />coordinates and an elevation. Cross sections were taken at 100-foot intervals except at drives and open parking areas along the route.
<br />Location and existing grades of drainage structure information, pole locations, edge of pavement, curbing, striping, existing signs, etc.
<br />Longitude used ground penetrating radar (GPR) along the entire survey limits to delineate any utilities. Longitude collected all the utilities
<br />and show them on the survey. Invert and grate elevations for all project area storm and catch basins were provided. Right-of-Way and
<br />property lines for the project area and adjacent properties were field verified and shown graphically. The survey is half the right of way on
<br />the side where the three right turn lanes are to be addressed and the entire right of way where the new turn lanes will be located. The
<br />survey included the entire median within the survey limits.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Boca Chica/NAS Key West Pump Station and FM Extension, Key West,
<br />FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Principal in Charge: Longitude Surveyors performed and prepared a topographical survey and underground utility designation using
<br />Ground Penetrating Radar (GPR) for the project with the Florida Keys Aqueduct Authority (FKAA) to connect the existing WWTP located on
<br />Navy property at Mile Marker 7 on US Highway 1 (Boca Chica, Florida) to the FKAA WWTP at Big Coppitt just north of Mile Marker 8.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Key Largo Drainage Improvements along overseas highway, Key
<br />Largo, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Principal in Charge: Longitude Surveyors provided surveying services for control, topographic and right of way surveys for “Dove Creek
<br />Estates”, “Section 1 Bay Haven”, “Section 2 Bay Haven”, “Section 3 Bay Haven”, and “Corrected Plat and Resubdivision of Seaside”,
<br />Plats. Also included underground utility designation and underground utility locates using Soft-dig equipment exposing possible conflicts
<br />with the proposed drainage line.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />SR-802/Lake Worth from Sherwood Forest Boulevard to SR-809,
<br />Military Trail, Florida (FDOT) FM No. 437884-1-32-01
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Surveyor & Mapper: Longitude Surveyors performed and provided a Topography/Digital Terrain Model (3D); at all five (5) intersections
<br />along SR-802/Lake Worth from Sherwood Forest Boulevard to SR-809/Military Trail, Florida; limits are 500-feet from the center of
<br />intersection on al legs; maintained right-of-way; located underground utilities; Surface Utility Designation, Sub-Surface Utility Location
<br />(VVH) verified vertical and horizontal control, survey surfaces; Designate and mark horizontal location of found underground utilities at
<br />proposed mast arm signal and lighting pole locations.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />FDOT District VI, Contract C9R91, FPID 423251-2-32-01 –
<br />SR25/Okeechobee Road from West of Krome Avenue to East of NW
<br />11th Avenue
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Principal in Charge: Longitude Surveyors performed and prepared a Topographic Survey and Right=of-Way Mapping for SR25 from North
<br />of the County line West Ramps at the HEFT; property boundaries, easements, and rights of way; located above- ground utility structures;
<br />collected improvements, buildings, pavement, gravel surfaces, drainage features (ditches and culverts), fences, etc., vegetation such as
<br />trees, shrubbery, grass, planting, etc. Underground utility facilities as provided by utility locates; collected cross-sections; horizontal and
<br />vertical control, invert and grate elevations for all project area storm and catch basins; Right-of-Way and property lines for project area and
|