Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, If not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT <br />KEY NUMBER <br />3 <br /> <br />21. TITLE AND LOCATION (City and State) <br />Brickell City Centre <br />Miami <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br />2017 <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />Swire Properties <br />b. POINT OF CONTACT NAME <br />Jeff Benson <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(305) 371-3877 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />Located at the core of the City’s financial district, Brickell City Centre is a nine-acre mixed-use development—and one of the largest <br />active projects in the City of Miami today. The site comprises approximately three city blocks. At completion, this $1.05 billion project <br />will include 2.9 million square feet of retail, office, residential, and entertainment space. The parking demand for this proposed <br />development will be satisfied by the construction of a two-level subterranean parking garage, which will extend beneath the right of <br />way for full connectivity between the three blocks. This LEED Neighborhood Certified project will also include sustainable elements <br />such as a climate ribbon, green roofs and cisterns for irrigation use. As the engineer of record, Kimley-Horn is providing an array of <br />civil engineering, transportation planning, and traffic engineering services. The scope of work includes design, permitting, and <br />construction administration for the installation of more than of 7,000 linear feet of new water and sewer utilities within an extremely <br />congested utility corridor; full <br />roadway reconstruction <br />including drainage <br />improvements; traffic <br />signalization; and on-site <br />stormwater management. <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br /> <br />Kimley-Horn <br />(2) FIRM LOCATION (City and State) <br /> <br />Miami, FL <br />(3) ROLE <br /> <br />Prime Consultant <br />b. <br />(1) FIRM NAME <br /> <br />Kimley-Horn <br />(2) FIRM LOCATION (City and State) <br /> <br />West Palm Beach, FL <br />(3) ROLE <br /> <br />Prime Consultant <br />c. <br />(1) FIRM NAME <br /> <br />Kimley-Horn <br />(2) FIRM LOCATION (City and State) <br /> <br />Fort Lauderdale, FL <br />(3) ROLE <br /> <br />Prime Consultant <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br /> <br /> <br /> <br />