Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, If not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT <br />KEY NUMBER <br />2 <br />21. TITLE AND LOCATION (City and State) <br />Master Planning for Key Biscayne Village-Wide <br />Undergrounding of Utilities Program <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br />Ongoing <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />Village of Key Biscayne <br />b. POINT OF CONTACT NAME <br />Jake Ozyman <br />c.POINT OF CONTACT TELEPHONE NUMBER <br />(305) 365-7568 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />In recent years, the Village has been investigating the feasibility of relocating existing overhead utilities (electric, telephone, and <br />cable) to an underground location to enhance the safety, reliability and aesthetics of these facilities within the Village. In August <br />2017, Kimley-Horn was selected to be the engineer for the Village’s undergrounding program. The design and construction of the <br />undergrounding program is anticipated to take multiple years to complete. In order to balance potentially competing priorities such <br />as cost, project duration, traffic impacts, etc. for this large-scale project, a Master Plan was developed in order to evaluate these <br />priorities ahead of any detailed design of any single undergrounding phase. The Master Plan will serve as a guide for the overall <br />program and outlines the schedule, sequencing, phasing, management of traffic impacts, project delivery methods, data collection, <br />public outreach, design criteria, and projected costs. To complete this Master Plan Kimley-Horn worked with the Village’s appointed <br />Undergrounding Utility Task force, <br />Village staff, and key stakeholders <br />in this conversion process included <br />FP&L, Comcast, and AT&T. The <br />Master Plan will be completed for <br />ultimate approval by the Village <br />Council. <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br />Kimley-Horn <br />(2) FIRM LOCATION (City and State) <br />Boca-Delray, FL <br />(3) ROLE <br />Prime Consultant <br />b. <br />(1) FIRM NAME <br />Kimley-Horn <br />(2) FIRM LOCATION (City and State) <br />West Palm Beach, FL <br />(3) ROLE <br />Prime Consultant <br />c. <br />(1) FIRM NAME <br />Media Relations Group <br />(2) FIRM LOCATION (City and State) <br />Palmetto Bay, FL <br />(3) ROLE <br />Public Involvement <br />d. <br />(1) FIRM NAME <br />Waypoint Engineering <br />(2) FIRM LOCATION (City and State) <br />Jupiter, FL <br />(3) ROLE <br />Electrical Engineering <br />e. <br />(1) FIRM NAME <br />Longitude Surveyors <br />(2) FIRM LOCATION (City and State) <br />Doral, FL <br />(3) ROLE <br />Land Surveying and Utilities Locating <br />f. <br />(1) FIRM NAME <br />Universal Engineering <br />Sciences <br />(2) FIRM LOCATION (City and State) <br />Medley, FL <br />(3) ROLE <br />Geotechnical Engineering <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3